Corum Solar Power Plant Project
GS-1418 ↗ · current registry ID: GS6566
#87of 1935 in Renewable energy#19of 295 in Turkey#29of 1801 in Gold Standard (GS)#32of 806 in AMS-I.D
Audit Analysis
The Corum Solar Power Plant is a Gold Standard grid-connected solar thermal project in Turkey with a solid additionality assessment (combined test, VVB-verified by RINA) and a jurisdictional baseline. The project is an avoidance-type renewable energy credit with minimal permanence risk, though several data gaps (FN/RB method, usage rates) and eight cross-document contradictions moderate confidence. Overall a reasonably well-documented project with minor verification findings that were all closed.
Red Flags
- Eight contradictions across documents, including baseline method shifting from 'project' (2023) to 'jurisdictional' (2024) and additionality test type differing between the PDD ('common practice') and the validation report ('combined')
- A Finding of Additional Relevance (FAR) noted a minor discrepancy in net electricity generation values between the main source and cross-check source, though the VVB stated it does not necessarily affect claimed ERs
- No buffer pool percentage stated and reversal events listed as 'not addressed' in the extracted record, though this is less critical for an avoidance-type solar electricity project
- FN/RB method and usage rate (assumed and verified) are not stated in any available document
Credit Vintages
| Issued | Retired | Available | ||
|---|---|---|---|---|
| 2017 | 103 | 103 | 0 | |
| 2018 | 7,688 | 355 | 7,333 | |
| 2019 | 7,717 | 1,253 | 6,464 | |
| 2020 | 8,035 | 160 | 7,875 | |
| 2021 | 7,491 | 149 | 7,342 | |
| 2022 | 7,183 | 0 | 7,183 | |
| 2023 | 8,866 | 0 | 8,866 | |
| 2024 | 1,539 | 0 | 1,539 | |
| Total | 48,622 | 2,020 | 46,602 |
Risk Indicators
Combined test, VVB-verified
Avoidance project, no reversal risk
0% deemed negligible, justified
Jurisdictional but contradicts 2023 report
FPIC, grievance, benefit sharing documented
CORSIA excluded, CCP status not stated
⚑ Dispute this rating
Are you the project owner?
Metadata correction (free)
Name, country, marketplace or links incorrect? Let us know.
Does not modify the score.
[email protected] →Pipeline re-run with new documents
Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.
Submit Documents →