CYY Global Plus Wastewater Treatment and Biogas Utilization Project
#5of 111 in Biogas#4of 22 in Thailand#158of 629 in Verra (VCS)
Audit Analysis
A VCS-registered biogas project in Thailand with confirmed additionality, a quantified 10% leakage deduction, and no material findings or corrective actions. However, the verified ERR for the 2024–25 monitoring period is roughly 280–690% of the pro-rata lifetime expectation, raising over-crediting concerns, and the project-specific modeled baseline lacks a recent reassessment. CORSIA and CCP eligibility are not stated in any available document.
Red Flags
- Verified ERR of 132,630 tCO₂e for a single 1-year monitoring period is approximately 284–690% of the pro-rata expectation derived from the lifetime claimed ERR (134,438–326,361 tCO₂e over 7 years), indicating a potential baseline underestimation or monitoring anomaly that warrants scrutiny.
- Two monitoring reports (July 2025 and September 2024) report materially different ERR figures (134,438 vs 326,361 tCO₂e) for the 'total_err_claimed' field, creating uncertainty about the correct lifetime baseline.
- Benefit-sharing documentation was present in the 2022 verification report but is absent from the 2026 verification report, suggesting a regression in social-safeguard reporting.
- CORSIA eligibility and CCP status are not stated in any extracted document, leaving dual-channel risk unassessed.
Credit Vintages
| Issued | Retired | Available | ||
|---|---|---|---|---|
| 2019 | 15,008 | 15,008 | 0 | |
| 2020 | 60,329 | 46,402 | 13,927 | |
| 2021 | 44,568 | 0 | 44,568 | |
| Total | 119,905 | 61,410 | 58,495 |
Risk Indicators
VVB-confirmed investment/combined test
Avoidance project, no buffer pool stated
10% quantified deduction
Project-specific modeled, no reassessment date
FPIC and grievance present; benefit-sharing regressed
CORSIA and CCP status not stated
⚑ Dispute this rating
Are you the project owner?
Metadata correction (free)
Name, country, marketplace or links incorrect? Let us know.
Does not modify the score.
[email protected] →Pipeline re-run with new documents
Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.
Submit Documents →