Skip to main content
GSEnergy Efficiency - DomesticNepalGeneral Methodologyv2.0

Efficient Cooking Initiative for off-grid Communities

GS-3727 ↗ · current registry ID: GS11785

#3of 202 in Industrial#1of 14 in Nepal#14of 426 in Gold Standard (GS)

6.6/ 10
Integrity
6.5
Transparency
7.0
Claim Safety
6.5
Documentation
6.5

Audit Analysis

A Gold Standard cookstove project in Nepal with VVB-confirmed additionality, no reversal events, and a verified usage rate of 97%. The main concerns are a 0% leakage deduction justified only as 'deemed negligible' (contradicting an earlier 'quantified' assessment in the validation report), a project-specific baseline, and the absence of a stated buffer pool. The project over-delivered relative to its PDD estimate, which is a positive signal for claim safety.

Red Flags

  • Leakage deduction of 0% with only a 'deemed negligible' justification in the verification report, while the earlier validation report described leakage as 'quantified' — the shift in treatment is unexplained and cookstove projects carry inherent displacement risk
  • No buffer pool percentage stated in any available document, leaving permanence risk unquantified for the crediting period
  • CORSIA eligibility and CCP status are not stated in any document, leaving dual-channel risk unassessed

Credit Vintages

IssuedRetiredAvailable
2022
4,59204,592
2023
8,73308,733
Total13,325013,325

Risk Indicators

Additionality

Combined test, VVB-confirmed

Permanence

No buffer pool stated; no reversals

Leakage

0% deduction, 'deemed negligible' only

Baseline

Project-specific, no reassessment date

Safeguards

FPIC, grievance mechanism, SDG mapping

Double-claim

CORSIA and CCP status not stated

Where to buy

+ Know where to buy this?

Listing multiple projects? Send us a CSV at [email protected].

⚑ Dispute this rating
Analysis ProvenanceScored2026-08-25General Methodology v2.0

Are you the project owner?

Metadata correction (free)

Name, country, marketplace or links incorrect? Let us know.

Does not modify the score.

[email protected]

Pipeline re-run with new documents

Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.

Submit Documents