Electricity Generation through Wind Power by SRHHL
#128of 770 in Renewable energy#71of 387 in India#141of 629 in Verra (VCS)#40of 417 in AMS-I.D
Audit Analysis
A 10-year VCS wind power project in India with confirmed investment additionality and no reversal risk, but undermined by a 19-month meter calibration delay, a grid emission factor frozen at 2009 values, and multiple documentation inconsistencies across the project's verification history. The project is inherently low-risk on permanence (avoidance-type) but carries moderate MRV and baseline-accuracy concerns.
Red Flags
- Meter calibration was delayed by 19 months and a maximum permissible error of 0.50% was applied for a period in 2011, raising questions about the accuracy of energy measurements during that window
- The grid emission factor of 0.944 tCO2/MWh is anchored to 2009 data; India's grid has become significantly cleaner since, meaning the actual displacement benefit per MWh is likely lower than claimed
- FPIC was not conducted despite the project's presence in a community context in India
- Four corrective actions were required in the 2022 verification report, including missing calibration records and inconsistent data formatting across wind turbines
Credit Vintages
| Issued | Retired | Available | ||
|---|---|---|---|---|
| 2009 | 313 | 11 | 302 | |
| 2010 | 12,441 | 12,441 | 0 | |
| 2011 | 11,070 | 0 | 11,070 | |
| 2016 | 5,398 | 5,398 | 0 | |
| 2017 | 11,435 | 11,425 | 10 | |
| 2018 | 10,125 | 9,395 | 730 | |
| 2019 | 9,146 | 9,116 | 30 | |
| Total | 59,928 | 47,786 | 12,142 |
Risk Indicators
Investment test confirmed by VVB
Avoidance project, no reversal risk
0% deemed negligible, appropriate for wind
Project-specific, grid EF from 2009
Grievance mechanism present, FPIC not conducted
CORSIA and CCP status not stated
⚑ Dispute this rating
Are you the project owner?
Metadata correction (free)
Name, country, marketplace or links incorrect? Let us know.
Does not modify the score.
[email protected] →Pipeline re-run with new documents
Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.
Submit Documents →