Energy Efficient Cooking Solution for low emission development in Nepal-2
#2of 14 in Nepal#105of 629 in Verra (VCS)#1of 46 in AMS-II.G
Audit Analysis
A VCS cookstove project (AMS-II.G) in Nepal with a VVB-confirmed investment additionality test, a quantified 5% leakage deduction, and no material findings. However, the project-specific baseline, an unresolved FPIC contradiction between the validation and verification reports, and the absence of a stated buffer pool or permanence mechanism temper the integrity picture. Documentation is reasonably extensive (21 documents) but carries 19 corrective actions and multiple cross-document inconsistencies.
Red Flags
- FPIC contradiction: the validation report (Jan 2021) records FPIC as conducted, while the verification report (Sep 2020) records it as not conducted — the more recent verification finding is privileged, leaving free, prior, and informed consent unconfirmed.
- Buffer pool percentage and permanence claim period are not stated in any available document, leaving the permanence risk for this 10-year crediting period unquantified.
- 19 corrective actions were raised by the VVB, including missing baseline emission calculation detail, unspecified remaining life of stoves, and incomplete applicability-criteria discussion — indicating the project documentation was not fully robust at verification.
Credit Vintages
| Issued | Retired | Available | ||
|---|---|---|---|---|
| 2018 | 5,162 | 5,162 | 0 | |
| 2019 | 30,390 | 30,390 | 0 | |
| 2020 | 28,488 | 3,010 | 25,478 | |
| 2021 | 27,523 | 0 | 27,523 | |
| 2022 | 18,281 | 0 | 18,281 | |
| Total | 109,844 | 38,562 | 71,282 |
Risk Indicators
VVB-confirmed investment test
Buffer pool and permanence period not stated
5% quantified deduction
Project-specific; reassessment not yet due (10-yr interval)
Grievance mechanism present; FPIC contradicted across docume
CORSIA excluded; CCP status not stated
⚑ Dispute this rating
Are you the project owner?
Metadata correction (free)
Name, country, marketplace or links incorrect? Let us know.
Does not modify the score.
[email protected] →Pipeline re-run with new documents
Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.
Submit Documents →