Flores I Wind Farm
#520of 1354 in Renewable energy#3of 10 in Uruguay#381of 1453 in CDM (UNFCCC)#415of 1042 in ACM0002
Audit Analysis
The Flores I Wind Farm is a standard CDM wind project in Uruguay with a VVB-confirmed investment additionality test and a jurisdictional baseline, presenting low inherent reversal risk. However, the absence of any monitoring report data, a low extraction confidence rating, and 20 corrective actions raised during validation limit confidence in the completeness and verifiability of the project record. The project's core design is sound, but the documentation trail is thin.
Red Flags
- No monitoring report or verified ERR figures are present in the extracted record, making it impossible to confirm actual delivery against the 1,454,032 tCO2 lifetime claim
- 20 corrective actions were required during validation, indicating substantial initial documentation gaps in the PDD
- Minimum extraction confidence is rated low, and one of the five source documents is listed as 'unknown' type
- CORSIA eligibility and CCP status are not stated in any available document
Credit Vintages
No issuances recorded on the registry.
Risk Indicators
VVB-confirmed investment test
Wind – no reversal risk
Negligible, appropriate for grid wind
Jurisdictional, standardised EF
Grievance mechanism present; FPIC not stated
CORSIA and CCP status not stated
⚑ Dispute this rating
Are you the project owner?
Metadata correction (free)
Name, country, marketplace or links incorrect? Let us know.
Does not modify the score.
[email protected] →Pipeline re-run with new documents
Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.
Submit Documents →