Gansu Yumen Sanshilijingzi Wind Power Project
Score Breakdown
Integrity
verified Additionality was confirmed by the VVB in the verification report, and no material findings or corrective actions were reported.
missing Leakage treatment is weak: the newer verification record says it was not addressed, and the baseline was project-specific with no reassessment date found.
Transparency
verified The verification report names the VVB, gives the monitoring period, and reports verified emission reductions of 273,926 tCO2e.
missing Public-facing MRV completeness is limited because the total claimed amount is not stated, the evidence list is sparse, and the extraction confidence is low.
Claim Safety
verified The project is a renewable wind project under ACM0002, and it is marked as not CORSIA-eligible, which lowers dual-market concern.
missing Claim safety is weakened by the unresolved leakage treatment and the large discrepancy in verified emissions between the newer and older documents.
Documentation
verified The file includes a recent verification report dated 2022-08-15 and identifies the VVB.
missing Only one evidence document is clearly identified, extraction confidence is low, and several key fields are not stated in available documents.
Detailed Analysis
Integrity
The verification report confirms additionality was checked by the VVB, and it reports no material findings or corrective actions, which supports the project’s core integrity. However, the baseline is only described as project-based, the last reassessment date is not found, and leakage is marked as not addressed in the newer report, which weakens confidence in the emissions accounting. No buffer pool information or reversal events are stated in the extracted record.
Transparency
Transparency is moderate because the verification report identifies the verifier, the monitoring period, and a verified emissions figure of 273,926 tCO2e. At the same time, the claimed emissions total is not stated, the evidence set is thin, and the extraction confidence is low, which limits how fully the project can be traced from the available documents. The registry status is clear, but the documentation is not complete enough for a high score.
Claim Safety
Claim safety is mixed. The project is a wind power activity under ACM0002 and is marked as not CORSIA-eligible, which reduces some market-claim risk, but the leakage treatment is weak and the baseline is not well documented. The large gap between the newer verified emissions figure and the older figure in the contradictions list raises over-crediting and reliability concerns.
Documentation
The documentation set includes a recent verification report and identifies the VVB, which is a positive sign. But the extraction confidence is low, only one evidence document is clearly listed, and several important items such as additionality test type, leakage deduction, buffer pool, and baseline reassessment are not found in the available record. The presence of newer safeguards statements is helpful, but the file remains incomplete.
Overall
Overall, this is a mid-quality VCS wind project with a credible additionality signal but meaningful documentation and accounting weaknesses. I privileged the newer 2022 verification report over older material because it is more recent and appears to be the authoritative verification source; that means I treated leakage as not addressed and used the newer verified emissions figure of 273,926 tCO2e. The contradictions matter: the older document reportedly said leakage was negligible, safeguards were absent, and verified emissions were 48,436 tCO2e, while the newer record says safeguards are present and verified emissions are much higher, so reliability is reduced and the scores are pulled down accordingly.
Audit Analysis
This wind project has some positive integrity signals, including VVB-confirmed additionality and no reported material findings, but key elements of the baseline and leakage treatment are weakly documented. The record also contains a major discrepancy in verified issuance and several older safeguards-related statements that conflict with the newer verification report, which reduces confidence in the file.
Project Description
Proponent: Gansu Jieyuan Wind Power Co., Ltd. Protocol categories: Energy industries (renewable/non-renewable sources) Protocols: ACM0002 Estimated annual GHG reductions: 106556 tCO2e Region: Asia Registration date: 2020-06-04
Red Flags
- Leakage is described as not addressed in the newer verification record, while an older document reportedly treated it as negligible.
- Verified emission reductions differ sharply between documents, with the newer figure far above the older one.
- Documentation quality is weakened by low extraction confidence and only one evidence document being clearly identified.
Credit Vintages
| Issued | Retired | Available | ||
|---|---|---|---|---|
| 2008 | 46,804 | 46,804 | 0 | |
| 2009 | 1,632 | 1,632 | 0 | |
| 2012 | 41,837 | 23,644 | 18,193 | |
| 2017 | 41,288 | 0 | 41,288 | |
| 2018 | 17,809 | 17,809 | 0 | |
| Total | 149,370 | 89,889 | 59,481 |
Cosa migliorerebbe questo punteggio
- Provide a clear leakage assessment with a quantified deduction or a documented justification for why leakage is negligible.
- Publish a reconciled emissions history and complete supporting documents, including the older and newer verification records and the baseline reassessment history.
Questi suggerimenti indicano quali prove pubbliche aggiuntive potrebbero migliorare il livello di confidenza di questa valutazione. Non garantiscono un punteggio futuro più alto.
Risk Indicators
VVB-confirmed additionality
No buffer pool stated
Leakage not addressed
Project baseline only
FPIC and grievance mechanism present
Not CORSIA-eligible
Where to buy
+ Know where to buy this?
Listing multiple projects? Send us a CSV at [email protected].
⚑ Dispute this rating
Sei il proprietario di questo progetto?
Correzione metadati (gratuita)
Nome, paese, marketplace o link errati? Segnalacelo.
Non modifica lo score.
[email protected] →Rivalutazione con nuovi documenti
Hai documentazione aggiornata non ancora inclusa? Puoi richiedere un nuovo run della pipeline con i nuovi input.
Invia Documenti →