GER Recycled PP Project
#69of 204 in China#227of 629 in Verra (VCS)#2of 23 in AMS-II.I
Audit Analysis
The GER Recycled PP Project is a VCS-registered plastic waste recycling project in China with VVB-confirmed additionality and inherently low permanence risk, but it relies on a project-specific baseline, lacks a stated buffer pool, and carries several documentation quality issues including four corrective actions and a grid emission factor discrepancy between the PDD and validation report. Verified credits for the first monitoring period represent roughly 77% of the pro-rata expectation, indicating conservative delivery.
Red Flags
- Grid emission factor differs between the PDD (0.5896, May 2023) and the validation report (0.52455, Dec 2023); the lower value in the validation report slightly inflates net credits relative to the original PDD assumption.
- Four corrective actions were required at verification, including a missing investment analysis sheet and incomplete monitoring plan parameters, indicating documentation quality gaps at the time of verification.
- A material finding flagged the need for a clear double-claiming declaration procedure in the joint PD-MR, raising residual risk of overlapping claims with other crediting mechanisms.
- No buffer pool percentage is stated in the available documents, leaving permanence risk unquantified despite the project's inherently low reversal profile.
Credit Vintages
No issuances recorded on the registry.
Risk Indicators
VVB-confirmed investment test
Low reversal risk but no buffer pool stated
0% deduction; justification inconsistent across reports
Project-specific baseline; no reassessment yet due
Grievance mechanism and benefit sharing present; FPIC not st
CORSIA/CCP status not stated; double-claiming CAR raised
⚑ Dispute this rating
Are you the project owner?
Metadata correction (free)
Name, country, marketplace or links incorrect? Let us know.
Does not modify the score.
[email protected] →Pipeline re-run with new documents
Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.
Submit Documents →