Vai al contenuto principale
HCS Removal Documentazione completa General Methodology v2.0

Grain Pedigree Seed Farm

TC-1981 ↗

2.0 / 10
Integrity
2.4
Transparency
1.1
Claim Safety
2.0
Documentation
2.8

Score Breakdown

Integrity

missing Additionality is not demonstrated in the extracted verification record, and no test type or VVB confirmation is stated.

missing Baseline method, leakage deduction, buffer pool, and reversal history are not found in the available documents.

Transparency

missing The monitoring period is stated for 2024, but the extracted record does not provide total credits claimed or verified.

inferred The verification report names Control Union Malaysia, but key MRV details such as usage monitoring and baseline reassessment are not stated.

Claim Safety

missing Over-crediting risk is elevated because the baseline approach, leakage treatment, and verified emission/removal figures are not available.

inferred CORSIA eligibility and CCP status are not stated, so dual-market claim risk cannot be ruled out from the extracted record.

Documentation

verified Two source documents were used, including a verification report dated 2025-05-16.

missing Extraction confidence is only medium, and the record lacks many core fields needed for a complete assessment.

Detailed Analysis

Integrity

The verification report for the 2024 monitoring period does not state any additionality test, VVB-confirmed additionality, baseline method, leakage deduction, buffer pool, or reversal events. With no material findings reported, there is no direct evidence of non-compliance, but the absence of core integrity evidence keeps the score very low.

Transparency

Transparency is weak because the extracted record does not include total ERR claimed or verified, usage monitoring method, baseline reassessment timing, or other core MRV details. The report does identify Control Union Malaysia and a 2024 monitoring period, which provides some traceability, but not enough for robust public scrutiny.

Claim Safety

Claim safety is limited by the lack of quantified issuance and baseline information, which makes over-crediting difficult to rule out. Leakage treatment is not stated, and both CORSIA eligibility and CCP status are absent, so the project cannot be treated as clearly low-risk for market claims.

Documentation

Documentation quality is constrained by the small evidence base: only two documents are listed, and the extraction confidence is medium rather than high. The verification report is recent, but the absence of key fields such as methodology, crediting period, and safeguards documentation leaves major gaps.

Overall

There are no explicit contradictions in the extracted record, so no document had to be privileged over another. However, the project is still heavily penalized because the core facts needed to verify integrity and claim safety are missing from the available documents, and the medium extraction confidence further reduces trust in the record. Under the scoring rules, the low integrity result would also trigger a cap on the overall score in post-processing.

Audit Analysis

The available verification record is too sparse to support a strong quality assessment. Key elements such as additionality, baseline method, leakage treatment, and permanence safeguards are not stated in the extracted documents, so the project carries substantial uncertainty and claim risk.

Project Description

Credits issued: 540

Red Flags

  • No additionality test or VVB-confirmed additionality is stated in the available record.
  • Baseline method, leakage treatment, buffer pool, and reversal information are all not found in the extracted documents.

Credit Vintages

Issued Retired Available
2024
540 0 540
Total 540 0 540

Cosa migliorerebbe questo punteggio

  • Provide the full validation and verification package showing the additionality test, baseline methodology, leakage assessment, and any buffer or reversal provisions.
  • Publish the issued and verified credit quantities, plus explicit statements on CORSIA eligibility, CCP status, and project safeguards such as FPIC and grievance mechanisms.

Questi suggerimenti indicano quali prove pubbliche aggiuntive potrebbero migliorare il livello di confidenza di questa valutazione. Non garantiscono un punteggio futuro più alto.

Risk Indicators

Additionality

No additionality evidence found

Permanence

Reversal risk not documented

Leakage

Leakage treatment not stated

Baseline

Baseline method not stated

Safeguards

Safeguards not documented

Double-claim

CORSIA/CCP status not stated

Where to buy

+ Know where to buy this?

Listing multiple projects? Send us a CSV at [email protected].

⚑ Dispute this rating
Analysis Provenance Scored 2026-04-12 General Methodology v2.0 Documentazione completa

Sei il proprietario di questo progetto?

Correzione metadati (gratuita)

Nome, paese, marketplace o link errati? Segnalacelo.

Non modifica lo score.

[email protected]

Rivalutazione con nuovi documenti

Hai documentazione aggiornata non ancora inclusa? Puoi richiedere un nuovo run della pipeline con i nuovi input.

Invia Documenti