Vai al contenuto principale
HCS Removal Documentazione completa General Methodology v2.0

River Valley Specialty Farms

TC-2035 ↗

1.9 / 10
Integrity
2.2
Transparency
1.0
Claim Safety
2.1
Documentation
2.4

Score Breakdown

Integrity

verified The monitoring report was verified by Control Union Malaysia for the 2024 monitoring period, which provides some independent oversight.

missing Additionality, baseline method, leakage treatment, and buffer provisions are not stated in the available documents, leaving core integrity questions unresolved.

Transparency

verified The project has at least two source documents used, including a validation report and issuance record, and the verification report is dated 2025-05-16.

missing No verified or claimed ERR totals, no monitoring methodology details, and no usage monitoring method are stated in the extracted record.

Claim Safety

verified The record does not show any explicit double-registration or reversal event evidence.

missing With no baseline, leakage, or quantified issuance data, over-crediting and green-claim risk remain materially elevated.

Documentation

verified The extraction confidence is medium rather than low, so the record is at least partially readable.

missing Many critical fields are not stated in available documents, and the extracted record contains no corrective actions or material findings to anchor a fuller review.

Detailed Analysis

Integrity

The verification report for the 2024 monitoring period names Control Union Malaysia as the VVB, which supports some independent review. However, the extracted record does not state any additionality test, baseline method, leakage deduction, buffer pool share, or reversal history, so the core integrity case is largely unsubstantiated. Because these are central to removal-credit quality, the score remains very low.

Transparency

Transparency is weak because the extracted documents do not provide verified or claimed ERR totals, a monitoring methodology, or a usage monitoring approach. The record does identify the project name, methodology version 1.1, VVB, and monitoring period, but that is not enough to support robust public scrutiny. The medium extraction confidence helps slightly, but the absence of key quantified fields dominates.

Claim Safety

Claim safety is limited by the lack of evidence on baseline validity, leakage handling, and issuance quantities. The record does not show CORSIA eligibility or CCP status, so there is no positive claim-quality signal from those channels. With no quantified reductions and no treatment of major accounting risks, the project carries a meaningful over-crediting risk.

Documentation

Documentation quality is poor to weak because only two source documents were used and many critical fields are not stated in available documents. The verification report date is recent, but recency alone does not compensate for missing core data. No material findings or corrective actions were reported, yet that appears to reflect the limited extraction rather than a fully documented clean file.

Overall

The overall score is constrained by major evidence gaps across additionality, baseline, leakage, permanence, and issuance quantification. There are no contradictions listed in the extracted record, so no conflict resolution was needed; however, the absence of contradictions does not offset the missing core data. Because documentation is weak and integrity is very low, the project should be treated cautiously until the underlying validation and issuance materials are reviewed in full.

Audit Analysis

The project record is too sparse to support a strong quality assessment. The verification report shows a monitoring period and an independent verifier, but key elements for additionality, baseline validity, leakage, permanence, and quantified issuance are not stated in the extracted documents. This creates a high evidence-gap risk and weakens confidence in the claim.

Project Description

Credits issued: 3,851

Red Flags

  • No baseline method, additionality test, or leakage treatment is stated in the extracted verification record.
  • No quantified verified or claimed emission reductions are available, and no buffer pool or reversal information is found.

Credit Vintages

Issued Retired Available
2024
3,851 0 3,851
Total 3,851 0 3,851

Cosa migliorerebbe questo punteggio

  • Provide the full validation, verification, and issuance documents showing the baseline method, additionality test, leakage treatment, and quantified verified reductions.
  • Disclose permanence safeguards, reversal/buffer arrangements, and registry status details including any CORSIA or CCP eligibility determinations.

Questi suggerimenti indicano quali prove pubbliche aggiuntive potrebbero migliorare il livello di confidenza di questa valutazione. Non garantiscono un punteggio futuro più alto.

Risk Indicators

Additionality

No additionality evidence found

Permanence

Reversal risk not documented

Leakage

Leakage not addressed

Baseline

Baseline method not stated

Safeguards

No safeguards documented

Double-claim

Registry status not stated

Where to buy

+ Know where to buy this?

Listing multiple projects? Send us a CSV at [email protected].

⚑ Dispute this rating
Analysis Provenance Scored 2026-04-12 General Methodology v2.0 Documentazione completa

Sei il proprietario di questo progetto?

Correzione metadati (gratuita)

Nome, paese, marketplace o link errati? Segnalacelo.

Non modifica lo score.

[email protected]

Rivalutazione con nuovi documenti

Hai documentazione aggiornata non ancora inclusa? Puoi richiedere un nuovo run della pipeline con i nuovi input.

Invia Documenti