Hemp Innovations
Score Breakdown
Integrity
verified Additionality was confirmed by Control Union Malaysia in the verification report.
missing Baseline method, leakage deduction, and buffer pool coverage are not stated in available documents.
Transparency
verified The monitoring period is clearly stated for 2024, and the verification report is dated 2025-05-16.
missing Total ERR claimed and verified, usage monitoring method, and other registry completeness details are not found in the extracted record.
Claim Safety
verified No material findings were reported in the verification report.
missing The record does not state whether the project is CORSIA-eligible or CCP-approved, and baseline and leakage details are missing.
Documentation
verified Two official documents were used, including a validation report and issuance record.
missing The extraction confidence is only medium, and several core fields are not stated in the available documents.
Detailed Analysis
Integrity
The verification report confirms additionality was reviewed by Control Union Malaysia, and it reports no material findings or corrective actions. That supports the project’s integrity, but the extracted record does not state the baseline method, any leakage deduction, or any buffer pool arrangement, so permanence and baseline robustness cannot be fully assessed.
Transparency
The monitoring period is clearly identified as 2024-01-01 to 2024-12-31, and the verification report is dated 2025-05-16. However, total ERR claimed and verified are not found in the extracted record, and the usage monitoring method, FNRB method, and other registry completeness fields are not stated, which limits transparency.
Claim Safety
Claim safety is weakened by the absence of baseline and leakage details, because over-crediting risk cannot be checked against a quantified baseline or leakage treatment. CORSIA eligibility and CCP status are also not stated in available documents, so dual-market claim risk remains unresolved even though no material findings were reported.
Documentation
The evidence base includes two official documents, and the project has a named VVB, Control Union Malaysia, which is a positive sign for documentation quality. Still, extraction confidence is only medium, and many key fields are not stated in the available documents, including crediting period, safeguards, and core methodological parameters.
Overall
There are no contradictions listed in the extracted record, so no document hierarchy issue needed to be resolved. The main limitation is missing evidence rather than conflicting evidence: the verification report supports additionality and shows no material findings, but baseline, leakage, permanence, and claim-eligibility details are largely absent. Because documentation is incomplete, the project scores as moderate rather than strong, and the transparency score would be further constrained if the post-scoring gate is applied.
Audit Analysis
The verification report confirms additionality through a VVB-reviewed assessment and reports no material findings, which supports the project’s integrity to a degree. However, key baseline, leakage, permanence, and claim-eligibility details are not stated in the extracted record, so the evidence base is incomplete and claim safety remains only moderate.
Project Description
Credits issued: 160
Red Flags
- No baseline method, leakage treatment, or buffer pool information was found in the extracted verification record.
- CORSIA eligibility and CCP status are not stated, leaving dual-claim risk unresolved.
Credit Vintages
| Issued | Retired | Available | ||
|---|---|---|---|---|
| 2024 | 160 | 0 | 160 | |
| Total | 160 | 0 | 160 |
Cosa migliorerebbe questo punteggio
- Publish the baseline methodology, leakage assessment, and any buffer pool or reversal provisions used for the project.
- Disclose verified ERR totals, claim-eligibility status, and safeguards documentation such as FPIC and grievance procedures.
Questi suggerimenti indicano quali prove pubbliche aggiuntive potrebbero migliorare il livello di confidenza di questa valutazione. Non garantiscono un punteggio futuro più alto.
Risk Indicators
VVB-confirmed additionality
No buffer or reversal detail stated
Leakage treatment not stated
Baseline method not stated
No safeguards evidence found
CORSIA/CCP status not stated
Where to buy
+ Know where to buy this?
Listing multiple projects? Send us a CSV at [email protected].
⚑ Dispute this rating
Registry Documents
Sei il proprietario di questo progetto?
Correzione metadati (gratuita)
Nome, paese, marketplace o link errati? Segnalacelo.
Non modifica lo score.
[email protected] →Rivalutazione con nuovi documenti
Hai documentazione aggiornata non ancora inclusa? Puoi richiedere un nuovo run della pipeline con i nuovi input.
Invia Documenti →