Vai al contenuto principale
HCS Removal Documentazione completa General Methodology v2.0

Star Rock Farms

TC-2049 ↗

2.1 / 10
Integrity
1.8
Transparency
2.2
Claim Safety
1.5
Documentation
3.4

Score Breakdown

Integrity

verified The verification report is from Control Union Malaysia and covers the 2024 monitoring period, which provides some independent oversight.

missing Additionality, baseline method, leakage deduction, and buffer pool treatment are not stated in the available documents, leaving core integrity questions unresolved.

Transparency

verified A named verifier and a defined monitoring period are present in the verification report.

missing Claimed versus verified issuance totals are not found, and the extracted record lacks baseline, leakage, and usage-monitoring details.

Claim Safety

missing The record does not state any baseline method, leakage justification, or additionality test, which raises over-crediting risk.

inferred CORSIA eligibility and CCP status are not stated, so dual-market claim risk cannot be ruled out from the extracted evidence.

Documentation

verified Two document types were used, including a verification report and supporting issuance/validation material.

missing Extraction confidence is only medium, and many key fields are not stated in the available record.

Detailed Analysis

Integrity

The verification report dated 2025-05-16 names Control Union Malaysia and covers monitoring from 2024-01-01 to 2024-12-31, which supports some independent review. However, the extracted record does not state any additionality test, baseline method, leakage deduction, buffer pool percentage, or reversal events, so the core integrity evidence is very weak. No material findings or corrective actions were reported, but that does not compensate for the missing methodological detail.

Transparency

Transparency is limited because the record does not include claimed versus verified issuance totals, baseline details, leakage treatment, or usage-monitoring method. The presence of a named VVB and a specific monitoring period is positive, but the documentation remains incomplete for public scrutiny. The medium extraction confidence also suggests some uncertainty in the source capture.

Claim Safety

Claim safety is poor because the extracted documents do not state how the baseline was set, whether leakage was deducted, or whether additionality was tested. Without those elements, the risk of over-crediting is elevated, especially for a removal project where methodological rigor matters. CORSIA eligibility and CCP status are not stated, so dual-claim risk cannot be excluded from the available evidence.

Documentation

Documentation quality is only modest because two document types were used, but the extracted record still leaves many critical fields blank. The monitoring period is current, yet the crediting period is not stated and the extraction confidence is only medium, indicating at least one source was not fully readable. No corrective actions were required, but the absence of findings is less informative than complete methodological disclosure.

Overall

The project cannot be rated highly because the available evidence omits several core quality inputs, especially additionality, baseline, leakage, and permanence safeguards. There are no contradictions to resolve in the extracted record, so no document was privileged over another; instead, the score is driven by the many missing fields and medium extraction confidence. Under the stated gate rules, the low documentation score would also constrain transparency in downstream scoring, and the very weak integrity profile keeps the overall assessment low.

Audit Analysis

The project’s documentation is too thin to support a strong quality assessment. The verification report shows a monitoring period and an independent VVB, but key elements such as additionality, baseline method, leakage treatment, and permanence safeguards are not stated in the extracted record. This creates a high risk of weak claim support and possible over-crediting.

Project Description

Credits issued: 144

Red Flags

  • No additionality test or VVB-confirmed additionality is stated in the available record.
  • Baseline method, leakage treatment, buffer pool, and reversal history are not stated in the extracted documents.

Credit Vintages

Issued Retired Available
2024
144 0 144
Total 144 0 144

Cosa migliorerebbe questo punteggio

  • Publish the full methodology and verification evidence for additionality, baseline setting, leakage treatment, and permanence safeguards.
  • Disclose verified issuance totals, registry status, and any CORSIA or CCP eligibility determinations with supporting documents.

Questi suggerimenti indicano quali prove pubbliche aggiuntive potrebbero migliorare il livello di confidenza di questa valutazione. Non garantiscono un punteggio futuro più alto.

Risk Indicators

Additionality

No additionality evidence

Permanence

No reversal or buffer data stated

Leakage

Leakage not addressed

Baseline

Baseline method not stated

Safeguards

No safeguards documented

Double-claim

CORSIA/CCP status not stated

Where to buy

+ Know where to buy this?

Listing multiple projects? Send us a CSV at [email protected].

⚑ Dispute this rating
Analysis Provenance Scored 2026-04-12 General Methodology v2.0 Documentazione completa

Sei il proprietario di questo progetto?

Correzione metadati (gratuita)

Nome, paese, marketplace o link errati? Segnalacelo.

Non modifica lo score.

[email protected]

Rivalutazione con nuovi documenti

Hai documentazione aggiornata non ancora inclusa? Puoi richiedere un nuovo run della pipeline con i nuovi input.

Invia Documenti