VCS avoidance India Vintage 2010, 2011, 2012, 2013, 2014 Registry: Registered Documentazione completa General Methodology v2.0

Grid-Connected Wind Electricity Generation Project In Tamil Nadu, India

VCS-498 ↗

4.9 / 10
Integrity
4.6
Transparency
5.2
Claim Safety
4.3
Documentation
6.1

Score Breakdown

Integrity

verified The validation/verification record indicates additionality was assessed using an investment test and confirmed by the VVB.

missing The monitoring report raises verification blockers (no ER sheet; missing generation reports; start date evidence requested), weakening confidence in baseline/quantification integrity.

Transparency

verified Key project parameters are disclosed (methodology AMS-I.D. v15; monitoring period 2016–2019; grid emission factor 0.93 with reference year 2021).

missing Inconsistencies across documents (crediting period and ER totals) and unresolved corrective actions reduce MRV transparency and traceability.

Claim Safety

verified The project is explicitly not CORSIA-eligible, reducing aviation-claims channel risk.

missing Over-crediting risk is elevated due to contradictory ER totals and missing/unclear evidence requested by the VVB for generation and start date.

Documentation

verified A relatively complete document set is referenced (PDD, validation, monitoring, issuance) with high extraction confidence and 13 documents used.

missing Multiple corrective actions and contradictions suggest documentation quality/consistency issues despite the number of documents.

Detailed Analysis

Integrity

Additionality appears reasonably supported because the project uses an investment test and the VVB (Earthood Services Private Limited) is recorded as confirming additionality in the validation/verification record. However, the monitoring report (2024-06-03) lists several corrective actions that directly affect quantification integrity, including that annual electricity to the grid and annual GHG reductions could not be verified due to a missing ER sheet and missing daily generation reports. Leakage is not addressed in the extracted record, and no leakage deduction is stated, which weakens methodological completeness for integrity.

Transparency

The monitoring report (2024-06-03) provides a clear monitoring period (2016-01-01 to 2019-12-31) and discloses key calculation inputs such as a grid emission factor of 0.93 (grid EF year 2021) under AMS-I.D. version 15. Transparency is reduced by the absence of a stated claimed ER total in the extracted record and by the presence of unresolved corrective actions requesting core evidence (ER sheet, generation reports, start date proof). Contradictions across documents on safeguards-related disclosures and ER totals further reduce confidence that the public record is internally consistent.

Claim Safety

The project is marked as not CORSIA-eligible, which lowers the risk of high-impact aviation-related claims. Nonetheless, greenwashing/over-crediting risk remains material because the monitoring report (2024-06-03) indicates key evidence gaps that prevented verification of annual generation and GHG reductions without additional documentation. The lack of an explicit leakage treatment in the extracted record and the contradictory verified ER figures across validation reports increase the risk that credited volumes could be overstated or not consistently supported.

Documentation

The extracted record references multiple document types (PDD, validation report, monitoring report, issuance) and indicates 13 documents were used with high extraction confidence, which supports a mid-range documentation score. However, the monitoring report (2024-06-03) includes multiple corrective actions requesting foundational evidence (ER sheet, start date evidence, stakeholder consultation support, daily generation reports, statutory consents), indicating documentation was not complete at the time of assessment. Contradictions between the monitoring report and validation report on safeguards/FPIC/grievance disclosures also suggest inconsistent documentation across the project file.

Overall

Key contradictions materially affect reliability: (1) safeguards, grievance mechanism, benefit sharing, and FPIC are stated as present in the monitoring report (2024-06-03) but absent in the validation report (2024-03-27); I privilege the more recent monitoring report for current practice, but the inconsistency lowers confidence and scores. (2) Verified ERs conflict between validation reports (21,476 in the 2024-07-04 validation report vs 29,626 in the 2021-07-05 validation report); I privilege the more recent 2024 figure as likely reflecting updated assessment, but the discrepancy signals data control issues and increases over-crediting risk. (3) The crediting period conflicts (2010–2019 in the monitoring report vs 2020–2029 in the PDD dated 2021-12-20); I privilege the PDD for formal crediting-period definition, but the mismatch with the monitoring report indicates serious record inconsistency and warrants a downward adjustment across integrity/transparency/claim safety.

Audit Analysis

This is a VCS wind power project with VVB-confirmed additionality, but the extracted record shows major MRV and consistency weaknesses. Leakage is not addressed, and multiple document contradictions (including the crediting period and verified ERs) increase over-crediting and claims risk.

Project Description

This project involves setting up two wind turbines with a combined capacity of 3.3 MW to generate clean energy through a renewable source. The annual electricity generation of 7,938 MWh will be exported to the nearest grid, helping to reduce the need for fossil fuel combustion and promote energy conservation. National Enterprises is the project proponent.

Red Flags

  • Monitoring report lists multiple corrective actions indicating key data could not be verified (missing ER sheet, missing daily generation reports, unclear start date evidence).
  • Leakage is not addressed and no leakage deduction is stated, despite the methodology requiring an explicit leakage treatment.
  • Contradictory crediting period across documents (2010–2019 vs 2020–2029) creates eligibility and accounting uncertainty.
  • Contradictory verified ER figures across validation reports (21,476 vs 29,626) undermines confidence in the credited volume.

Credit Vintages

Issued Retired Available
2010
5,707 5,707 0
2011
5,687 5,687 0
2012
5,829 5,829 0
2013
4,852 4,852 0
2014
4,161 4,161 0
2015
3,390 2,390 1,000
Total 29,626 28,626 1,000

Cosa migliorerebbe questo punteggio

  • Resolve all corrective actions by providing the ER calculation sheet, daily generation reports, start date evidence, and statutory consents, and ensure the VVB confirms closure in a final verification statement.
  • Publish a reconciled, single source of truth for the crediting period and verified ER totals (with registry links/issuance tables) and explicitly document leakage applicability and any deduction under AMS-I.D.

Questi suggerimenti indicano quali prove pubbliche aggiuntive potrebbero migliorare il livello di confidenza di questa valutazione. Non garantiscono un punteggio futuro più alto.

Risk Indicators

Additionality

VVB-confirmed investment test

Permanence

Avoidance project; no reversal risk indicated

Leakage

Leakage not addressed / deduction not stated

Baseline

Project-specific baseline; reassessed in 2020

Safeguards

Safeguards/FPIC reported but inconsistent across docs

Double-claim

Not CORSIA-eligible; CCP status not stated

Where to buy

Marketplaces

+ Know where to buy this?

Listing multiple projects? Send us a CSV at [email protected].

⚑ Dispute this rating
Analysis Provenance Scored 2026-04-02 General Methodology v2.0 Documentazione completa

Sei il proprietario di questo progetto?

Correzione metadati (gratuita)

Nome, paese, marketplace o link errati? Segnalacelo.

Non modifica lo score.

[email protected]

Rivalutazione con nuovi documenti

Hai documentazione aggiornata non ancora inclusa? Puoi richiedere un nuovo run della pipeline con i nuovi input.