Grid Connected Wind Power Project By M/S. D. J. Malpani In Rajasthan
#1584of 1935 in Renewable energy#879of 975 in India#1182of 1339 in Verra (VCS)#542of 806 in AMS-I.D
Audit Analysis
A grid-connected wind power project in Rajasthan with a fundamentally sound design (investment-test additionality, jurisdictional grid baseline, reasonable zero-leakage justification), but severely undermined by an extensive list of material findings, 21 corrective actions, multiple inter-document contradictions, and a verified emission reduction of only ~60% of the pro-rata ex-ante expectation. The project remains in 'Verification approval requested' status and has not yet been approved for issuance.
Red Flags
- Verified ERR of 24,127 tCO2 is only ~60% of the pro-rata ex-ante expectation (40,299 tCO2 for the 3-year monitoring period out of a 10-year crediting period), and the verification report itself flags an 'insufficient explanation for significant difference between ex-ante and ex-post GHG ERR'
- 30+ material findings and 21 corrective actions across verification and monitoring reports, including missing pre-project scenario, missing stakeholder communication mechanism, inconsistent site-visit documentation, and an unexplained 35% under-delivery versus the registered PDD estimate
- Registry status is 'Verification approval requested' — the project has not been approved for credit issuance, and multiple foundational documentation gaps remain unresolved
- Contradiction in baseline method: the 2026 verification report states 'jurisdictional' while the 2012 validation report states 'project', raising questions about which baseline was actually applied
- FPIC status contradicts between the 2021 verification report (not conducted) and the 2026 verification report (conducted), with no clear resolution documented
Credit Vintages
| Issued | Retired | Available | ||
|---|---|---|---|---|
| 2016 | 853 | 853 | 0 | |
| 2017 | 9,632 | 9,632 | 0 | |
| 2018 | 8,468 | 8,468 | 0 | |
| 2019 | 8,885 | 8,885 | 0 | |
| 2020 | 8,472 | 8,472 | 0 | |
| 2021 | 9,614 | 8,342 | 1,272 | |
| 2022 | 1,233 | 0 | 1,233 | |
| Total | 47,157 | 44,652 | 2,505 |
Risk Indicators
VVB-confirmed investment test
reversal 'N/A' without analysis
0% with reasonable justification for wind
Jurisdictional but contradicted by earlier 'project' baseline
FPIC and grievance present; benefit sharing absent
CORSIA and CCP status not stated
Where to buy
Marketplaces
+ Know where to buy this?
Listing multiple projects? Send us a CSV at [email protected].
⚑ Dispute this rating
Are you the project owner?
Metadata correction (free)
Name, country, marketplace or links incorrect? Let us know.
Does not modify the score.
[email protected] →Pipeline re-run with new documents
Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.
Submit Documents →