Skip to main content
GSEnergy Efficiency - DomesticUgandaGeneral Methodologyv2.1

GS1247 VPA 140 Lango Safe Water Project

GS-1103 ↗ · current registry ID: GS6350

#448of 1329 in Industrial#50of 163 in Uganda#707of 1801 in Gold Standard (GS)

5.1/ 10
Integrity
5.5
Transparency
5.0
Claim Safety
4.5
Documentation
5.5

Audit Analysis

The Lango Safe Water Project is a mature Gold Standard energy-efficiency project (operational since 2016/2018) with VVB-confirmed additionality and no reported reversal events, but it is undermined by a 0% leakage deduction with no supporting justification, an exact match between claimed and verified ERR figures that raises independent-verification concerns, and ten cross-document contradictions that erode confidence in the data record. Multiple corrective actions remain open, including demonstration of grievance-mechanism effectiveness and water-quality remediation.

Red Flags

  • Claimed and verified ERR are identical (51,658 tCO₂e), suggesting the VVB may not have independently recalculated the emission reductions
  • Leakage deduction of 0% with justification recorded as 'not addressed' in the 2025 verification report, while the PDD originally proposed a 5% deduction
  • Ten contradictions across documents, including conflicting crediting-period start dates (2016 vs 2018), conflicting FNRB values (0.89 vs 0.80), and conflicting usage-rate figures (87.5% vs 99.5%)
  • Multiple Forward Action Requests remain open, including demonstration of grievance-mechanism effectiveness and water-quality remediation at boreholes LAN090 and LAN114
  • CORSIA eligibility is confirmed while CCP status is not stated, creating potential dual-channel crediting risk

Credit Vintages

IssuedRetiredAvailable
2018
2,4132,4130
2019
6,0876,0870
2020
5,0095,0090
2021
3,2283,18741
2022
2,9072982,609
2023
4,80604,806
2024
1,63701,637
Total26,08716,9949,093

Risk Indicators

Additionality

Combined test, VVB-confirmed

Permanence

Energy-efficiency; no reversals reported

Leakage

0% deduction, no justification

Baseline

Project-specific; reassessed 2024

Safeguards

FPIC done; grievance mechanism open finding

Double-claim

CORSIA-eligible; CCP status not stated

Where to buy

+ Know where to buy this?

Listing multiple projects? Send us a CSV at [email protected].

⚑ Dispute this rating
Analysis ProvenanceScored2026-09-03General Methodology v2.1

Are you the project owner?

Metadata correction (free)

Name, country, marketplace or links incorrect? Let us know.

Does not modify the score.

[email protected]

Pipeline re-run with new documents

Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.

Submit Documents