Vai al contenuto principale
GS Energy Efficiency - Domestic Uganda Documentazione completa General Methodology v2.0

GS1247 VPA 140 Lango Safe Water Project

GS-1103 ↗

4.8 / 10
Integrity
5.4
Transparency
4.8
Claim Safety
4.6
Documentation
3.7

Score Breakdown

Integrity

verified Additionality was confirmed by the VVB, and the baseline was reassessed in 2024 under the TPDDTEC methodology.

missing Leakage treatment is inconsistent: one part of the record says it is not addressed, while another reports a 5% deduction; reversal risk is also not addressed.

Transparency

verified The monitoring period is stated for 2023-04-01 to 2024-03-31, and the VVB is named as Earthood Services Limited.

missing The extracted record has low extraction confidence and only one evidence document is identified, with contradictions on key monitoring inputs and crediting period.

Claim Safety

verified The project reports a 5% leakage deduction and a very high verified usage rate of 99.5%, which supports some conservatism in the calculations.

missing The baseline remains project-specific rather than standardized, and the record shows conflicting values for leakage, fNRB, and usage assumptions, increasing over-crediting risk.

Documentation

verified FPIC and grievance mechanisms are mentioned, and several findings were raised and closed during verification.

missing The extraction confidence is low, the evidence set is thin, and multiple forward action requests remain open or deferred to the next monitoring period.

Detailed Analysis

Integrity

The VVB confirms additionality, which is a meaningful positive for integrity, and the baseline was last reassessed in 2024 under TPDDTEC. However, leakage is internally inconsistent: the extracted record says leakage is not addressed, yet it also reports a 5% deduction, and reversal events are not addressed. The open forward action requests on seasonal variation, water quality, and recalculating fNRB also point to unresolved methodological issues.

Transparency

The monitoring period is clearly stated as 2023-04-01 to 2024-03-31, and the verifier is identified as Earthood Services Limited. Still, the record has low extraction confidence and only one evidence document is identified, which limits traceability. Several key inputs are contradicted across documents, including usage monitoring, fNRB, leakage, and the crediting period, reducing transparency.

Claim Safety

Claim safety is helped by the reported 5% leakage deduction and the very high verified usage rate of 99.5%. But the baseline is project-specific, not a standardized jurisdictional baseline, and the record contains conflicting values for leakage treatment, fNRB, and usage assumptions. Because CORSIA eligibility is true while CCP status is not stated, dual-claim risk is not fully resolved.

Documentation

The record includes safeguards such as FPIC and a grievance mechanism, and several verification findings were closed. Even so, the extraction confidence is low, the evidence base is limited, and multiple forward action requests remain outstanding for the next monitoring period. The documentation therefore looks incomplete and somewhat fragile for a high-confidence assessment.

Overall

Overall, the project looks mid-range rather than high quality: there is VVB-confirmed additionality and some safeguard evidence, but the integrity and documentation picture is weakened by unresolved leakage treatment, unaddressed reversal risk, and several contradictions. I privileged the more recent validation report dated 2025-08-18 for conflicting items such as leakage, reversal events, and benefit sharing, because it is the latest available document; where older documents suggested different values, that inconsistency lowered the scores. The low extraction confidence further reduces trust in the record, and the integrity score remains above the gate threshold but not by a wide margin.

Audit Analysis

The project has some positive safeguards and the VVB confirmed additionality, but several core risk items are weakly documented or unresolved. Leakage treatment is only partly clear, reversal risk is not addressed, and the record contains multiple contradictions that reduce confidence in the claimed figures.

Project Description

Developer: CO2balance UK ltd Type: Energy Efficiency - Domestic Size: Micro Scale Methodology: GS TPDDTEC v 1. Crediting period: 2018-09-21 → 2025-09-20 Estimated annual credits: 9962 tCO2e SDGs: Goal 6: Clean Water and Sanitation, Goal 13: Climate Action, Goal 3: Good Health and Well-Being, Goal 5: Gender Equality

Red Flags

  • Leakage is described as not addressed in the extracted record, even though a 5% deduction is also reported.
  • The documents contain contradictions on leakage, usage monitoring, fNRB, usage rates, and crediting period, which weakens reliability.

Credit Vintages

Issued Retired Available
2018
2,413 2,413 0
2019
6,087 6,087 0
2020
5,009 5,009 0
2021
3,228 3,187 41
2022
2,907 298 2,609
2023
4,806 0 4,806
2024
1,637 0 1,637
Total 26,087 16,994 9,093

Cosa migliorerebbe questo punteggio

  • Provide a single reconciled monitoring and verification package that resolves the contradictions on leakage, fNRB, usage rates, and crediting period.
  • Document reversal treatment, leakage justification, and the basis for the 5% deduction more clearly, and close the remaining forward action requests before the next issuance.

Questi suggerimenti indicano quali prove pubbliche aggiuntive potrebbero migliorare il livello di confidenza di questa valutazione. Non garantiscono un punteggio futuro più alto.

Risk Indicators

Additionality

VVB-confirmed additionality

Permanence

No reversal treatment stated

Leakage

Leakage treatment inconsistent

Baseline

Project baseline, reassessed

Safeguards

FPIC and grievance mechanism present

Double-claim

CORSIA-eligible, CCP status not stated

Where to buy

+ Know where to buy this?

Listing multiple projects? Send us a CSV at [email protected].

⚑ Dispute this rating
Analysis Provenance Scored 2026-04-19 General Methodology v2.0 Documentazione completa

Sei il proprietario di questo progetto?

Correzione metadati (gratuita)

Nome, paese, marketplace o link errati? Segnalacelo.

Non modifica lo score.

[email protected]

Rivalutazione con nuovi documenti

Hai documentazione aggiornata non ancora inclusa? Puoi richiedere un nuovo run della pipeline con i nuovi input.

Invia Documenti