GS1247 VPA 143 Manicaland Safe Water

GS-1125 ↗

4.3 / 10
Integrity
4.8
Transparency
4.1
Claim Safety
4.3
Documentation
3.2

Score Breakdown

Integrity

verified Additionality was confirmed by Earthood Services Limited in the validation report, which is a meaningful positive signal.

missing Leakage is not addressed in the latest validation record, and reversal treatment is also not addressed; the project uses a project baseline rather than a more robust standardized baseline.

Transparency

verified The monitoring period is stated as 2023-01-01 to 2024-12-31, and the validation report names the VVB and methodology version.

missing Total verified emissions reductions are not stated in the extracted record, and the low extraction confidence suggests at least one key document was hard to read.

Claim Safety

verified The baseline was reassessed in 2024, and the reported leakage deduction is 0%, which at least shows an explicit treatment in the record.

missing The project relies on a project-specific baseline, the FNRB value is based on a national default, and the record contains contradictions on leakage, usage monitoring, and crediting period.

Documentation

verified The record includes a validation report date, a named VVB, a monitoring period, and multiple safeguards such as FPIC and a grievance mechanism.

missing The extracted evidence list is effectively incomplete, the extraction confidence is low, and several material findings were raised and closed, indicating documentation friction.

Detailed Analysis

Integrity

The validation report from Earthood Services Limited confirms additionality, which supports the project’s core environmental case. However, the baseline is project-specific rather than standardized, leakage is not addressed in the latest record, and reversal events are also not addressed, which weakens permanence and accounting robustness. The report notes several closed CLs and CARs, so there were issues during validation even if they were resolved.

Transparency

The monitoring period is clearly stated, and the validation report identifies the VVB and methodology version 4.0 under TPDDTEC. But the extracted record does not state total verified or claimed emission reductions, and the evidence list is sparse. The low extraction confidence further reduces confidence that the public documentation is complete and easy to audit.

Claim Safety

Claim safety is mixed because the baseline was reassessed in 2024 and the record includes a leakage deduction of 0%, but the latest validation text says leakage is not addressed, creating uncertainty about over-crediting controls. The FNRB value is based on a national default, and the project-specific baseline plus contradictory usage and crediting-period records increase the risk of overstated claims. No clear CORSIA or CCP status is provided, so dual-market claim risk cannot be ruled out from the extracted record.

Documentation

Documentation quality is limited by the low extraction confidence and the fact that the evidence_docs list is not informative beyond an unknown entry. Positively, the record includes a named VVB, a monitoring period, FPIC, a grievance mechanism, and benefit-sharing language. Still, the presence of multiple closed findings and several contradictory fields suggests the documentation set is not fully clean or consistently reported.

Overall

The project shows some procedural strengths, especially VVB-confirmed additionality and documented safeguards, but the evidence base is weakened by missing emissions figures, unresolved leakage treatment, and low extraction confidence. I privileged the latest validation report for fields where it conflicts with older documents, because it is the most recent source, but I discounted confidence because the contradictions are material: leakage is described as negligible in an earlier document yet not addressed in the latest one, usage monitoring shifts from self-report to annual survey, FNRB changes from local field to national default, and the crediting period conflicts across records. Under the scoring rules, the documentation weakness also constrains transparency, and the integrity score remains below strong-project territory.

Audit Analysis

The project has some positive safeguards and the VVB confirmed additionality, but key integrity elements are weakly documented or not addressed, especially leakage and reversal treatment. The record also contains several contradictions across documents, and the extraction confidence is low, which reduces trust in the reported claims.

Project Description

Developer: CO2balance UK ltd Type: Energy Efficiency - Domestic Size: Micro Scale Methodology: GS TPDDTEC v 1. Crediting period: 2018-06-10 → 2023-06-09 Estimated annual credits: 10000 tCO2e SDGs: Goal 5: Gender Equality, Goal 13: Climate Action, Goal 6: Clean Water and Sanitation, Goal 3: Good Health and Well-Being

Red Flags

  • Leakage is marked as not addressed in the latest validation record, despite an earlier document describing it as negligible.
  • The monitoring and crediting-period records conflict across documents, and the extracted record has low extraction confidence.

Credit Vintages

Issued Retired Available
2018
5,616 5,616 0
2019
9,006 5,704 3,302
2020
6,757 6,123 634
2021
5,034 0 5,034
2022
1,786 0 1,786
Total 28,199 17,443 10,756

Cosa migliorerebbe questo punteggio

  • Publish a clean, reconciled monitoring package with verified emission reductions, clear leakage treatment, and a single consistent crediting-period record.
  • Provide explicit statements on CORSIA eligibility, CCP status, reversal monitoring, and the basis for the FNRB and usage-rate assumptions.

Questi suggerimenti indicano quali prove pubbliche aggiuntive potrebbero migliorare il livello di confidenza di questa valutazione. Non garantiscono un punteggio futuro più alto.

Risk Indicators

Additionality

VVB-confirmed additionality

Permanence

reversal treatment not addressed

Leakage

leakage treatment inconsistent

Baseline

project baseline, reassessed in 2024

Safeguards

FPIC and grievance mechanism present

Double-claim

CORSIA/CCP status not stated

Where to buy

+ Know where to buy this?

Listing multiple projects? Send us a CSV at [email protected].

⚑ Dispute this rating
Analysis Provenance Scored 2026-04-19 General Methodology v2.0 Documentazione completa

Sei il proprietario di questo progetto?

Correzione metadati (gratuita)

Nome, paese, marketplace o link errati? Segnalacelo.

Non modifica lo score.

[email protected]

Rivalutazione con nuovi documenti

Hai documentazione aggiornata non ancora inclusa? Puoi richiedere un nuovo run della pipeline con i nuovi input.

Invia Documenti