Skip to main content
GSEnergy Efficiency - DomesticUgandaGeneral Methodologyv2.1

GS1247 VPA 185 Lango Safe Water Project

GS-1556 ↗ · current registry ID: GS7364

#1059of 1329 in Industrial#134of 163 in Uganda#1501of 1801 in Gold Standard (GS)

4.2/ 10
Integrity
4.5
Transparency
4.0
Claim Safety
3.5
Documentation
5.0

Audit Analysis

The Lango Safe Water Project has VVB-confirmed additionality and no reversal events, but is undermined by a 0% leakage deduction with no justification, a 2,000-fold discrepancy in the non-renewable baseline factor across verification reports, and severe operational degradation (72% operationality, multiple water-quality failures). The volume of open corrective actions and forward action requests signals persistent MRV weaknesses that erode confidence in the verified emission reductions.

Red Flags

  • fNRB value of 0.0004 in the 2025 verification report versus 0.81 in the 2024 verification report — a 2,000-fold discrepancy that cannot be reconciled without clarification and raises serious data-reliability concerns
  • Leakage deduction of 0% with justification recorded as 'not addressed' in the most recent verification report, while the PDD originally proposed a 5% deduction
  • Operational degradation: breakdown days surged to 16,883 (72% operationality), time-saving dropped from 60.7% to 28.5%, and 6 boreholes failed water-quality tests with 3 months of crediting removed for each
  • Usage rate of 0.995 assumed and verified, which appears inconsistent with the reported 28% downtime and water-quality failures at multiple boreholes
  • Discrepancy between claimed solar-panel installation and the technology actually observed at site (CL#11)

Credit Vintages

IssuedRetiredAvailable
2019
2,7052,7050
2020
7,2357,2350
2021
4,4673,0031,464
2022
2,8708492,021
2023
5,73705,737
2024
2,06302,063
Total25,07713,79211,285

Risk Indicators

Additionality

VVB-confirmed combined test

Permanence

Avoidance project, no reversals

Leakage

0% deduction, not addressed

Baseline

Project-specific, reassessed 2024

Safeguards

FPIC, grievance mechanism, benefit sharing

Double-claim

CORSIA and CCP status not stated

Where to buy

+ Know where to buy this?

Listing multiple projects? Send us a CSV at [email protected].

⚑ Dispute this rating
Analysis ProvenanceScored2026-09-03General Methodology v2.1

Are you the project owner?

Metadata correction (free)

Name, country, marketplace or links incorrect? Let us know.

Does not modify the score.

[email protected]

Pipeline re-run with new documents

Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.

Submit Documents