GS1247 VPA 187 Lango Safe Water Project

GS-1543 ↗ · current registry ID: GS7366

#765of 1329 in Industrial#96of 163 in Uganda#1153of 1801 in Gold Standard (GS)

4.7/ 10
Integrity
4.5
Transparency
5.0
Claim Safety
4.5
Documentation
5.0

Audit Analysis

The Lango Safe Water Project is a Gold Standard borehole-based safe water project in Uganda with VVB-verified additionality and documented safeguards, but it is undermined by a severe fNRB value discrepancy (0.0004 vs 0.81 across verification reports), a 0% leakage deduction with no justification, significant operational degradation (72% borehole operationality, multiple water-quality failures), and an extensive backlog of open corrective and follow-up actions. The project's credit claims rest on a project-specific baseline and an assumed usage rate (99.5%) that substantially exceeds the verified rate (87.5%), creating meaningful over-crediting risk.

Red Flags

  • fNRB value differs by a factor of ~2,000 between the 2024 verification report (0.81) and the 2025 verification report (0.0004); the 2025 value is implausibly low for a firewood/charcoal-displacement baseline and raises serious data-reliability concerns
  • Leakage deduction is 0% and the most recent verification report (Feb 2025) records the justification as 'not addressed', despite the PDD originally proposing a 5% deduction
  • Borehole operationality has degraded to 72% (16,883 breakdown days) and 5–6 boreholes were removed from crediting due to water-quality failures, yet the full claimed ERR of 51,658 tCO₂e was verified without apparent proportional adjustment
  • Assumed usage rate of 99.5% versus a verified rate of 87.5% (from the Dec 2025 monitoring report) represents a 12-percentage-point gap that inflates credit claims
  • No buffer pool is in place to cover the risk of borehole failure or user reversion to baseline water sources

Credit Vintages

IssuedRetiredAvailable
2019
1,7871,7870
2020
6,3396,3390
2021
3,6633,62241
2022
3,1901,3371,853
2023
5,58505,585
2024
2,02702,027
Total22,59113,0859,506

Risk Indicators

Additionality

VVB-confirmed combined test

Permanence

72% borehole operationality

Leakage

0% deduction, justification not addressed

Baseline

Project-specific; reassessed 2024

Safeguards

FPIC, grievance mechanism, benefit sharing documented

Double-claim

CORSIA and CCP status not stated

Where to buy

+ Know where to buy this?

Listing multiple projects? Send us a CSV at [email protected].

⚑ Dispute this rating
Analysis ProvenanceScored2026-09-03General Methodology v2.1

Are you the project owner?

Metadata correction (free)

Name, country, marketplace or links incorrect? Let us know.

Does not modify the score.

[email protected]

Pipeline re-run with new documents

Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.

Submit Documents