Skip to main content
GSEnergy Efficiency - DomesticZambiaGeneral Methodologyv2.1

GS1247 VPA 192 Zambia Eastern Province Safe Water Project

GS-1821 ↗ · current registry ID: GS7458

#766of 1329 in Industrial#17of 33 in Zambia#1154of 1801 in Gold Standard (GS)

4.7/ 10
Integrity
4.5
Transparency
5.0
Claim Safety
4.0
Documentation
5.5

Audit Analysis

This Gold Standard safe water project (borehole installation displacing firewood use) has VVB-verified additionality and no reversal events, but is undermined by an extensive list of open corrective actions, nine cross-document contradictions, and a significant gap between the claimed lifetime ERR (150,000 tCO₂e) and the verified figure for the monitoring period (14,266 tCO₂e). The leakage treatment is inconsistent across documents (0% in the verification report vs. 5% in the PDD), and no buffer pool percentage is stated. Overall, the project shows moderate structural soundness but weak operational and data-reliability performance.

Red Flags

  • Nine cross-document contradictions identified, including a 10× discrepancy in total ERR (150,000 in the 2023 verification report vs. 14,266 in the 2022 monitoring report) and conflicting leakage deductions (0% vs. 5%)
  • Five Forward Action Requests (FAR 01–05) remain open, covering VPA-level SDG indicators, fNRB reporting, and monitoring justification
  • 27 boreholes failed water quality tests in Q1 2022 and 21 of 50 required professional flushing, indicating operational reliability concerns that affect the validity of emission reduction claims
  • CORSIA eligibility and CCP status are both unstated, leaving dual-channel risk unassessed

Credit Vintages

IssuedRetiredAvailable
2019
475159316
2020
5,6612,1663,495
2021
6,0909255,165
2022
2,2305441,686
Total14,4563,79410,662

Risk Indicators

Additionality

VVB-verified combined test

Permanence

no reversals

Leakage

0% vs 5% contradiction; 'deemed negligible'

Baseline

Project-specific; reassessed 2024

Safeguards

FPIC, grievance mechanism, benefit sharing

Double-claim

CORSIA and CCP status both unstated

Where to buy

+ Know where to buy this?

Listing multiple projects? Send us a CSV at [email protected].

⚑ Dispute this rating
Analysis ProvenanceScored2026-09-03General Methodology v2.1

Are you the project owner?

Metadata correction (free)

Name, country, marketplace or links incorrect? Let us know.

Does not modify the score.

[email protected]

Pipeline re-run with new documents

Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.

Submit Documents