GS1247 VPA 192 Zambia Eastern Province Safe Water Project
GS-1821 ↗ · current registry ID: GS7458
#766of 1329 in Industrial#17of 33 in Zambia#1154of 1801 in Gold Standard (GS)
Audit Analysis
This Gold Standard safe water project (borehole installation displacing firewood use) has VVB-verified additionality and no reversal events, but is undermined by an extensive list of open corrective actions, nine cross-document contradictions, and a significant gap between the claimed lifetime ERR (150,000 tCO₂e) and the verified figure for the monitoring period (14,266 tCO₂e). The leakage treatment is inconsistent across documents (0% in the verification report vs. 5% in the PDD), and no buffer pool percentage is stated. Overall, the project shows moderate structural soundness but weak operational and data-reliability performance.
Red Flags
- Nine cross-document contradictions identified, including a 10× discrepancy in total ERR (150,000 in the 2023 verification report vs. 14,266 in the 2022 monitoring report) and conflicting leakage deductions (0% vs. 5%)
- Five Forward Action Requests (FAR 01–05) remain open, covering VPA-level SDG indicators, fNRB reporting, and monitoring justification
- 27 boreholes failed water quality tests in Q1 2022 and 21 of 50 required professional flushing, indicating operational reliability concerns that affect the validity of emission reduction claims
- CORSIA eligibility and CCP status are both unstated, leaving dual-channel risk unassessed
Credit Vintages
| Issued | Retired | Available | ||
|---|---|---|---|---|
| 2019 | 475 | 159 | 316 | |
| 2020 | 5,661 | 2,166 | 3,495 | |
| 2021 | 6,090 | 925 | 5,165 | |
| 2022 | 2,230 | 544 | 1,686 | |
| Total | 14,456 | 3,794 | 10,662 |
Risk Indicators
VVB-verified combined test
no reversals
0% vs 5% contradiction; 'deemed negligible'
Project-specific; reassessed 2024
FPIC, grievance mechanism, benefit sharing
CORSIA and CCP status both unstated
⚑ Dispute this rating
Are you the project owner?
Metadata correction (free)
Name, country, marketplace or links incorrect? Let us know.
Does not modify the score.
[email protected] →Pipeline re-run with new documents
Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.
Submit Documents →