Skip to main content
GSEnergy Efficiency - DomesticZambiaGeneral Methodologyv2.1

GS1247 VPA 195 Zambia Eastern Province Safe Water Project

GS-1824 ↗ · current registry ID: GS7461

#964of 1329 in Industrial#26of 33 in Zambia#1390of 1801 in Gold Standard (GS)

4.4/ 10
Integrity
5.0
Transparency
4.0
Claim Safety
4.0
Documentation
4.5

Audit Analysis

This Gold Standard safe water project under a multi-country cookstove VPA has VVB-confirmed additionality and no reported reversals, but is undermined by eight cross-document contradictions (including a usage-rate discrepancy of 0.9 versus 15), the absence of any verified ERR figure, a project-specific baseline, and a large backlog of open corrective actions and findings. The sector classification mismatch (industrial vs. domestic) and the application of a cookstove methodology to water treatment add further uncertainty to the integrity of the claimed reductions.

Red Flags

  • Usage rate assumed at 0.9 in the 2023 PDD but recorded as 15 in a 2022 appendix — a discrepancy of an order of magnitude that directly affects the magnitude of claimed reductions
  • No verified ERR figure found in any available document; the 9,414 tCO₂e claimed cannot be independently cross-checked
  • Eight contradictions across documents, including conflicting leakage treatments (quantified 5% vs. deemed negligible 0%), conflicting fNRB methods (local field vs. national default), and conflicting crediting periods (2025–2030 vs. 2013–2020)
  • Extensive list of open corrective actions and findings (FAR 01–05 still open) covering SDG indicators, fNRB reporting, and monitoring justification
  • Sector classified as 'industrial' despite being a domestic safe water / energy efficiency project, and a cookstove methodology (TPDDTEC v.4.0) applied to water treatment technologies

Credit Vintages

No issuances recorded on the registry.

Risk Indicators

Additionality

VVB-confirmed combined test

Permanence

no reversals reported

Leakage

5% deduction but contradicted by 0% in earlier PDD

Baseline

Project-specific; reassessed 2024; fNRB method in conflict

Safeguards

FPIC, grievance mechanism, benefit sharing documented

Double-claim

CORSIA and CCP status not stated

Where to buy

+ Know where to buy this?

Listing multiple projects? Send us a CSV at [email protected].

⚑ Dispute this rating
Analysis ProvenanceScored2026-09-03General Methodology v2.1

Are you the project owner?

Metadata correction (free)

Name, country, marketplace or links incorrect? Let us know.

Does not modify the score.

[email protected]

Pipeline re-run with new documents

Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.

Submit Documents