Skip to main content
GSEnergy Efficiency - DomesticUgandaGeneral Methodologyv2.1

GS1247 VPA 72 Lango Safe Water Project

GS-916 ↗ · current registry ID: GS5186

#1010of 1329 in Industrial#128of 163 in Uganda#1443of 1801 in Gold Standard (GS)

4.3/ 10
Integrity
4.5
Transparency
5.0
Claim Safety
4.0
Documentation
3.5

Audit Analysis

The Lango Safe Water Project has VVB-confirmed additionality and no reversal events, but is undermined by an extensive list of material findings, 23 corrective actions, multiple cross-document contradictions, and a 0% leakage deduction that conflicts with the original PDD's 5% proposal. The verified usage rate (99.56%) exceeds the assumed 90%, which is conservative for crediting but the fNRB calculation used an incorrect tool version, raising reliability concerns. Overall, the project's data quality and documentation integrity are significantly below the standard expected for a Gold Standard-registered project.

Red Flags

  • 23 corrective actions and 20+ material findings reported in the verification report, including fNRB calculation using an incorrect Tool 30 version and multiple ER calculation inconsistencies across boreholes
  • Leakage deduction of 0% in the verification report contradicts the PDD's original 5% proposal, and the justification shifted from 'deemed negligible' (PDD 2013) to 'quantified' (VR 2023) without a clear quantified basis
  • FPIC status is contradictory: the monitoring report (2024) states it was not conducted, while the validation report (2025) states it was conducted
  • Grievance mechanism books were being used as guest books rather than for their intended purpose, indicating the mechanism is not functioning effectively in practice
  • Water quality contamination (red worms) observed at the Apuru borehole during the site visit, with no confirmed remediation

Credit Vintages

IssuedRetiredAvailable
2016
6306300
2017
9,9729,9720
2018
10,00010,0000
2019
6,7496,73712
2020
6,1056,1050
2021
4,3344,27757
2022
3,6458312,814
2023
9150915
Total42,35038,5523,798

Risk Indicators

Additionality

VVB-confirmed combined test

Permanence

mixed evidence / unresolved risk

Leakage

0% deduction, contradictory justification

Baseline

Project-specific, reassessed 2024

Safeguards

Grievance mechanism present but misused; FPIC contradictory

Double-claim

CORSIA and CCP status not stated

Where to buy

+ Know where to buy this?

Listing multiple projects? Send us a CSV at [email protected].

⚑ Dispute this rating
Analysis ProvenanceScored2026-09-03General Methodology v2.1

Are you the project owner?

Metadata correction (free)

Name, country, marketplace or links incorrect? Let us know.

Does not modify the score.

[email protected]

Pipeline re-run with new documents

Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.

Submit Documents