Skip to main content
GSEnergy Efficiency - DomesticUgandaGeneral Methodologyv2.1

GS1247 VPA 75 Lango Safe Water Project

GS-919 ↗ · current registry ID: GS5189

#1011of 1329 in Industrial#129of 163 in Uganda#1444of 1801 in Gold Standard (GS)

4.3/ 10
Integrity
4.5
Transparency
5.0
Claim Safety
4.0
Documentation
3.5

Audit Analysis

The Lango Safe Water Project is a long-running Gold Standard water-pumping efficiency project in Uganda with a confirmed additionality test and no reversal events, but it is burdened by an unusually high volume of material findings, 22 corrective actions, and ten cross-document contradictions that significantly undermine confidence in the underlying data. The leakage treatment is internally inconsistent (0% deduction in the verification report versus 5% in the PDD, with conflicting justifications), and the fNRB calculation was flagged for using an incorrect tool version. Overall, the project's design logic is sound but the data quality and documentation consistency are well below the level expected for a mature, multi-year project.

Red Flags

  • Ten cross-document contradictions identified, including a 13.6× discrepancy in claimed ER between the PDD (4,403) and the monitoring report (60,139), and conflicting leakage treatments (0% vs 5% deduction with opposing justifications).
  • 22 corrective actions required, including recalculation of the fNRB using the correct Tool 30 version, correction of non-functional day counts for multiple boreholes, and provision of missing GPS coordinates — indicating systemic data-quality weaknesses.
  • Leakage deduction of 0% in the verification report contradicts the 5% deduction in the PDD, and the justification shifts between 'quantified' and 'deemed negligible' across documents, leaving the true leakage treatment unclear.
  • Grievance mechanism books were being used as guest books by water guardians, indicating the safeguard was not functioning as intended at the community level.

Credit Vintages

IssuedRetiredAvailable
2017
8,2908,2900
2018
10,00010,0000
2019
5,3935,3930
2020
3,5382,0271,511
2021
1,9011,607294
2022
2,1392,09742
2023
5110511
Total31,77229,4142,358

Risk Indicators

Additionality

VVB-confirmed combined test

Permanence

mixed evidence / unresolved risk

Leakage

0% deduction contradicts PDD 5%; justification inconsistent

Baseline

Project-specific baseline, reassessed 2024

Safeguards

FPIC done; grievance mechanism present but misused in practice

Double-claim

CORSIA and CCP status both unknown

Where to buy

+ Know where to buy this?

Listing multiple projects? Send us a CSV at [email protected].

⚑ Dispute this rating
Analysis ProvenanceScored2026-09-03General Methodology v2.1

Are you the project owner?

Metadata correction (free)

Name, country, marketplace or links incorrect? Let us know.

Does not modify the score.

[email protected]

Pipeline re-run with new documents

Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.

Submit Documents