GS1247 VPA 76 Lango Safe Water Project
GS-920 ↗ · current registry ID: GS5190
#1109of 1329 in Industrial#143of 163 in Uganda#1560of 1801 in Gold Standard (GS)
Audit Analysis
The Lango Safe Water Project is a Gold Standard energy-efficiency borehole project in Uganda with VVB-verified additionality and no reported reversal events, but it is undermined by eleven cross-document contradictions, a 0% leakage deduction that conflicts with the PDD's 5% figure, an unexplained 13-fold discrepancy in claimed emissions reductions between the PDD and the monitoring report, and 23 open corrective actions. The absence of a stated buffer pool, unknown CORSIA/CCP status, and a project-specific baseline further weaken the credit's robustness.
Red Flags
- Claimed ERR of 60,139 tCO₂e in the 2024 monitoring report versus 4,403 tCO₂e in the 2023 PDD — a 13.6× discrepancy that is not explained by scope or period differences in the available documents.
- Leakage deduction of 0% in the 2023 verification report contradicts the PDD's 5% deduction; the justification shifts from 'deemed negligible' (PDD, 2013) to 'quantified' (verification report, 2023) without a clear methodological bridge.
- FPIC status is contradictory: the 2024 monitoring report states FPIC was not conducted, while the 2025 validation report states it was — a fundamental safeguards gap that cannot be resolved from the available record.
- 23 corrective actions remain open, including errors in fNRB calculations (wrong Tool 30 version), missing GPS coordinates, incorrect monitoring-period dates, and unresolved water-quality contamination at the Apuru borehole.
Credit Vintages
| Issued | Retired | Available | ||
|---|---|---|---|---|
| 2017 | 8,329 | 8,329 | 0 | |
| 2018 | 10,000 | 10,000 | 0 | |
| 2019 | 4,931 | 4,931 | 0 | |
| 2020 | 3,312 | 1,778 | 1,534 | |
| 2021 | 2,590 | 2,556 | 34 | |
| 2022 | 2,064 | 1,312 | 752 | |
| 2023 | 464 | 73 | 391 | |
| Total | 31,690 | 28,979 | 2,711 |
Risk Indicators
VVB-verified combined test
no reversals
0% deduction contradicts PDD 5%
Project-specific; reassessed 2024
FPIC status contradictory; grievance books misused
CCP and CORSIA status unknown
⚑ Dispute this rating
Are you the project owner?
Metadata correction (free)
Name, country, marketplace or links incorrect? Let us know.
Does not modify the score.
[email protected] →Pipeline re-run with new documents
Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.
Submit Documents →