Skip to main content
GSEnergy Efficiency - DomesticUgandaGeneral Methodologyv2.1

GS1247 VPA 76 Lango Safe Water Project

GS-920 ↗ · current registry ID: GS5190

#1109of 1329 in Industrial#143of 163 in Uganda#1560of 1801 in Gold Standard (GS)

4.1/ 10
Integrity
4.5
Transparency
4.0
Claim Safety
4.0
Documentation
3.5

Audit Analysis

The Lango Safe Water Project is a Gold Standard energy-efficiency borehole project in Uganda with VVB-verified additionality and no reported reversal events, but it is undermined by eleven cross-document contradictions, a 0% leakage deduction that conflicts with the PDD's 5% figure, an unexplained 13-fold discrepancy in claimed emissions reductions between the PDD and the monitoring report, and 23 open corrective actions. The absence of a stated buffer pool, unknown CORSIA/CCP status, and a project-specific baseline further weaken the credit's robustness.

Red Flags

  • Claimed ERR of 60,139 tCO₂e in the 2024 monitoring report versus 4,403 tCO₂e in the 2023 PDD — a 13.6× discrepancy that is not explained by scope or period differences in the available documents.
  • Leakage deduction of 0% in the 2023 verification report contradicts the PDD's 5% deduction; the justification shifts from 'deemed negligible' (PDD, 2013) to 'quantified' (verification report, 2023) without a clear methodological bridge.
  • FPIC status is contradictory: the 2024 monitoring report states FPIC was not conducted, while the 2025 validation report states it was — a fundamental safeguards gap that cannot be resolved from the available record.
  • 23 corrective actions remain open, including errors in fNRB calculations (wrong Tool 30 version), missing GPS coordinates, incorrect monitoring-period dates, and unresolved water-quality contamination at the Apuru borehole.

Credit Vintages

IssuedRetiredAvailable
2017
8,3298,3290
2018
10,00010,0000
2019
4,9314,9310
2020
3,3121,7781,534
2021
2,5902,55634
2022
2,0641,312752
2023
46473391
Total31,69028,9792,711

Risk Indicators

Additionality

VVB-verified combined test

Permanence

no reversals

Leakage

0% deduction contradicts PDD 5%

Baseline

Project-specific; reassessed 2024

Safeguards

FPIC status contradictory; grievance books misused

Double-claim

CCP and CORSIA status unknown

Where to buy

+ Know where to buy this?

Listing multiple projects? Send us a CSV at [email protected].

⚑ Dispute this rating
Analysis ProvenanceScored2026-09-03General Methodology v2.1

Are you the project owner?

Metadata correction (free)

Name, country, marketplace or links incorrect? Let us know.

Does not modify the score.

[email protected]

Pipeline re-run with new documents

Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.

Submit Documents