Skip to main content
GSEnergy Efficiency - DomesticUgandaGeneral Methodologyv2.1

GS1247 VPA 83 Lango Safe Water Project

GS-927 ↗ · current registry ID: GS5197

#970of 1329 in Industrial#123of 163 in Uganda#1396of 1801 in Gold Standard (GS)

4.4/ 10
Integrity
4.2
Transparency
5.0
Claim Safety
4.5
Documentation
3.8

Audit Analysis

The Lango Safe Water Project (boreholes, Uganda) has VVB-confirmed additionality and no reported reversal events, but is undermined by a project-specific baseline, a 0% leakage deduction that contradicts the PDD's original 5% figure, the absence of a buffer pool, and an unusually long list of corrective actions spanning calculation errors, missing evidence, and methodological gaps. Multiple cross-document contradictions on leakage justification, fNRB method, usage rates, and the crediting period further erode confidence in the data integrity.

Red Flags

  • Leakage deduction reduced from 5% (PDD, 2023) to 0% (verification report, 2024) with contradictory justifications ('quantified' vs 'deemed negligible'), raising over-crediting risk
  • Extensive corrective actions (30+ items) covering missing ER calculations, inconsistent breakdown days, incorrect table values, missing coordinates/photos, and methodological gaps indicate persistent documentation and calculation quality issues
  • Crediting period contradiction: validation report (2025) states 2025–2030 while the PDD (2023) states 2013–2026, creating uncertainty about the actual project timeline
  • fNRB method contradiction: verification report (2024) records 'local field' measurement while the monitoring report (2023) records 'national default', which could materially change the baseline

Credit Vintages

IssuedRetiredAvailable
2018
6,5026,5020
2019
6,2876,2870
2020
5,5355,5350
2021
2,6272,60324
2022
2,2621,601661
2023
6080608
Total23,82122,5281,293

Risk Indicators

Additionality

VVB-confirmed combined test

Permanence

mixed evidence / unresolved risk

Leakage

0% deduction, contradictory justification

Baseline

Project-specific, reassessed 2024

Safeguards

Grievance & benefit sharing present; FPIC contradictory

Double-claim

CCP and CORSIA status not stated

Where to buy

+ Know where to buy this?

Listing multiple projects? Send us a CSV at [email protected].

⚑ Dispute this rating
Analysis ProvenanceScored2026-09-03General Methodology v2.1

Are you the project owner?

Metadata correction (free)

Name, country, marketplace or links incorrect? Let us know.

Does not modify the score.

[email protected]

Pipeline re-run with new documents

Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.

Submit Documents