GS5047 VPA45 African Improved Cookstoves and Clean Water Programme: Albertine Rift Wildlife Corridor Cook Stove Project II
GS-2024 ↗ · current registry ID: GS7541
#544of 1329 in Industrial#65of 163 in Uganda#842of 1801 in Gold Standard (GS)
Audit Analysis
This Gold Standard cookstove project in Uganda has VVB-verified additionality and a monitoring record where verified emissions reductions closely match claimed figures, but it is burdened by 14 material findings, a 25-percentage-point gap between assumed and verified usage rates, no buffer pool, and no FPIC. Multiple contradictions across the PDD, monitoring reports, and verification report reduce confidence in the consistency of the project's reported parameters.
Red Flags
- Usage rate verified at 67.12% versus 90% assumed in the ex-ante estimate — a 25-percentage-point shortfall that raises over-crediting risk in the original design
- 14 material findings in the verification report, including stove durability failures, missing usage surveys for two years, and seven grievances from beneficiaries
- FPIC was not conducted despite the project operating in a wildlife corridor community
- FNRB value contradicts between documents: 0.82 (national default, monitoring report 2024) versus 0.98 (local field, PDD 2018)
Credit Vintages
| Issued | Retired | Available | ||
|---|---|---|---|---|
| 2022 | 4,180 | 4,180 | 0 | |
| 2023 | 3,338 | 3,059 | 279 | |
| Total | 7,518 | 7,239 | 279 |
Risk Indicators
VVB-confirmed combined test
no reversal data
0% deduction; justification contradicts across docs
Project-specific; no reassessment date; FNRB conflict
Grievance mechanism present; FPIC not conducted
CORSIA and CCP status not stated
⚑ Dispute this rating
Are you the project owner?
Metadata correction (free)
Name, country, marketplace or links incorrect? Let us know.
Does not modify the score.
[email protected] →Pipeline re-run with new documents
Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.
Submit Documents →