GS5658 VPA 34: “Access to energy for local development and resilience building in Uganda”
GS-3029 ↗ · current registry ID: GS11041
#711of 1329 in Industrial#87of 163 in Uganda#1063of 1801 in Gold Standard (GS)
Audit Analysis
This Gold Standard domestic energy-efficiency PoA (improved cookstoves in Uganda) has VVB-confirmed additionality and no reported reversals, but is undermined by a project-specific baseline, a 0% leakage deduction with inconsistent justification across documents, and a heavy load of 15 material findings and 14 corrective actions that point to systemic MRV quality issues. The verified ERR of 29,071 tCO₂e for the most recent monitoring period substantially exceeds the pro-rata share of the 37,697 tCO₂e lifetime ex-ante estimate, raising over-crediting concerns that are not fully resolved by the available documentation.
Red Flags
- 15 material findings and 14 corrective actions in the 2025 verification report, including calculation errors, emission-factor inconsistencies, and crediting-period mismatches, indicate systemic MRV quality problems
- Verified ERR of 29,071 tCO₂e for a single 1-year monitoring period is roughly 5× the pro-rata expectation (~5,730 tCO₂e) derived from the 37,697 tCO₂e lifetime ex-ante estimate over a ~6.6-year crediting period, suggesting possible over-crediting or a mis-specified ex-ante baseline
- Leakage deduction of 0% is justified as 'deemed negligible' in the 2025 verification report, yet an earlier 2023 verification report described the leakage treatment as 'quantified'—the inconsistency is unresolved
- No buffer pool percentage is stated in any available document, leaving permanence risk unmitigated despite the absence of reported reversals
- CORSIA eligibility and CCP status are not stated in any extracted document, leaving dual-channel risk unassessed
Credit Vintages
| Issued | Retired | Available | ||
|---|---|---|---|---|
| 2021 | 4,160 | 4,160 | 0 | |
| 2022 | 6,566 | 6,566 | 0 | |
| 2023 | 6,801 | 974 | 5,827 | |
| 2024 | 1,189 | 0 | 1,189 | |
| Total | 18,716 | 11,700 | 7,016 |
Risk Indicators
VVB-confirmed but test type not stated
mixed evidence / unresolved risk
0% deduction, justification inconsistent across reports
Project-specific, reassessment date not stated
Grievance mechanism confirmed 2025; FPIC not stated
CORSIA and CCP status not stated in any document
⚑ Dispute this rating
Are you the project owner?
Metadata correction (free)
Name, country, marketplace or links incorrect? Let us know.
Does not modify the score.
[email protected] →Pipeline re-run with new documents
Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.
Submit Documents →