Guangdong Chaonan Chengtian Wind Power project
#110of 770 in Renewable energy#40of 204 in China#130of 629 in Verra (VCS)#78of 383 in ACM0002
Audit Analysis
A 10-year VCS wind power project (ACM0002) with VVB-confirmed investment additionality and inherent permanence (avoidance-type, no reversal risk). The project is not CORSIA-eligible and carries no CCP concerns, but nine cross-document contradictions—particularly in ERR figures, baseline method, and safeguards—undermine data reliability. FPIC was not conducted and the leakage justification is inconsistent across documents.
Red Flags
- Nine contradictions across documents, including conflicting ERR figures (234,867 vs 314,198) and baseline method (project vs jurisdictional), indicating data quality issues
- FPIC not conducted and grievance mechanism status is contradictory between the 2010 verification report and the 2022 monitoring report
- Leakage deduction of 0% with justification described as 'not addressed' in the verification report but 'deemed negligible' in the monitoring report—no explicit quantification or robust justification
- Grid emission factor dated 2006 with no evidence of periodic update or reassessment within the 10-year crediting period
Credit Vintages Exhausted
| Issued | Retired | Available | ||
|---|---|---|---|---|
| 2009 | 70,983 | 70,983 | 0 | |
| Total | 70,983 | 70,983 | 0 |
Risk Indicators
VVB-confirmed investment test
Avoidance project, no reversal risk
0% deduction, justification inconsistent
Method contradicted across documents
FPIC absent, grievance status contradictory
Not CORSIA-eligible, no CCP approval
⚑ Dispute this rating
Are you the project owner?
Metadata correction (free)
Name, country, marketplace or links incorrect? Let us know.
Does not modify the score.
[email protected] →Pipeline re-run with new documents
Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.
Submit Documents →