GZL ENERGY BIOGAS PLANT
#74of 111 in Biogas#113of 121 in Turkey#533of 629 in Verra (VCS)#41of 62 in AMS-III.D
Audit Analysis
The GZL Energy Biogas Plant is a VCS-registered methane-recovery and renewable-electricity project in Turkey with a 10-year crediting period and a lifetime claim of 523,460 tCO₂e. Additionality was confirmed by the VVB via a common-practice test, and the project is inherently an avoidance type with lower permanence risk, but the absence of a buffer pool, unaddressed reversal events, a missing FPIC process, and a contradictory leakage justification between the validation report and the PDD create meaningful integrity and claim-safety concerns. No monitoring data or verified emission reductions are available, limiting the ability to confirm over- or under-delivery.
Red Flags
- Local stakeholder consultation (FPIC) was not conducted; a VERRA exemption was requested due to COVID-19 and a FAR was raised (validation report, material finding).
- Twelve corrective actions were required at validation, including incomplete sections (4.4, 5.1, 5.2, 5.3, 2.3, 2.4), missing baseline justification for AMS I.D, and inconsistent energy units (validation report).
- Leakage justification is contradictory: the validation report (2021-06-22) states leakage was 'quantified' while the PDD (2021-07-15) states it was 'deemed negligible,' yet the deduction is 0% in both.
- No buffer pool percentage is stated and reversal events are marked 'not addressed' in the extracted record, despite the project being an avoidance type.
- No monitoring period, verified ERR, or usage-monitoring method is available in the extracted documents, preventing any delivery verification.
Credit Vintages
No issuances recorded on the registry.
Risk Indicators
Common-practice test, VVB-confirmed
Avoidance type, no buffer pool, reversal not addressed
0% deduction, contradictory justification
Project-specific, modeled, no reassessment data
Mentioned but FPIC not conducted, no grievance mechanism
CORSIA and CCP status not stated
⚑ Dispute this rating
Are you the project owner?
Metadata correction (free)
Name, country, marketplace or links incorrect? Let us know.
Does not modify the score.
[email protected] →Pipeline re-run with new documents
Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.
Submit Documents →