Brascarbon Methane Recovery Project BCA-BRA-18
#67of 104 in Brazil#506of 629 in Verra (VCS)#38of 62 in AMS-III.D
Audit Analysis
The Brascarbon Methane Recovery Project is a registered VCS AMS-III.D project in Brazil with a VVB-verified investment additionality test and appropriate avoidance-type permanence treatment. However, the verification report lists eight material findings and eight corrective actions covering fundamental documentation gaps (project start date, baseline parameters, regulatory surplus, implementation status), and four cross-document contradictions reduce confidence in the underlying data. The project is functional but its documentation robustness and baseline specificity warrant caution.
Red Flags
- Eight material findings and eight corrective actions were raised by the VVB in the 2025 verification report, covering project start date inconsistency, missing baseline parameter evidence, unillustrated regulatory surplus, and incorrect VCS Standard version application
- Four contradictions between the 2023 and 2025 monitoring reports on baseline type (measured vs modeled), additionality test (combined vs investment), claimed ERR (57,885 vs 51,514), and leakage justification (deemed negligible vs quantified) indicate inconsistent project documentation over time
- The verified ERR for the 2023 monitoring period (51,514 tCO2e) is identical to the lifetime claimed ERR, implying the project delivered roughly 700% of the pro-rata annual expectation if the claimed figure is a 7-year lifetime estimate — a ratio that is either extremely conservative ex-ante or suggests the figures are on the same basis and the comparison is not meaningful
- Leakage deduction is 0% with a 'quantified' justification per the verification report, yet the 2025 monitoring report characterises it as 'deemed negligible' — for a methane recovery project where fugitive emissions are a realistic risk, the absence of a non-zero deduction is a concern
Credit Vintages
| Issued | Retired | Available | ||
|---|---|---|---|---|
| 2022 | 54,112 | 47,226 | 6,886 | |
| 2023 | 51,514 | 0 | 51,514 | |
| Total | 105,626 | 47,226 | 58,400 |
Risk Indicators
VVB-verified investment test
Avoidance project, no reversal risk
0% deduction, justification inconsistent across docs
Project-specific modeled baseline, no reassessment due yet
FPIC, grievance mechanism, benefit sharing documented
CORSIA and CCP status not stated
⚑ Dispute this rating
Are you the project owner?
Metadata correction (free)
Name, country, marketplace or links incorrect? Let us know.
Does not modify the score.
[email protected] →Pipeline re-run with new documents
Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.
Submit Documents →