Skip to main content
VCSEnergy industries (renewable/non-renewable sources); Waste handling and disposalTurkey Registry: RegisteredAMS-III.D

Elmadag Biogas Power Plant

VCS-3890 ↗

#57of 111 in Biogas#105of 121 in Turkey#463of 629 in Verra (VCS)#29of 62 in AMS-III.D

4.8/ 10
Integrity
5.5
Transparency
4.0
Claim Safety
5.0
Documentation
4.0

Audit Analysis

The Elmadag Biogas Power Plant is a registered VCS project in Turkey using AMS-III.D and AMS-I.D methodologies, with additionality confirmed by the VVB via a regulatory test. However, the project carries eight material findings from validation, a contradiction in how leakage is treated between the PDD and validation report, and a complete absence of monitoring or verification data in the available record. The low extraction confidence and documentation gaps limit the ability to fully assess credit quality.

Red Flags

  • Eight material findings (CL 01–06, CAR 01–02) identified during validation, including missing calibration details, missing eligibility justification, and an incorrectly classified B0,LT parameter
  • Contradiction between the PDD (leakage 'quantified') and the validation report (leakage 'deemed negligible'), with the VVB itself flagging the leakage justification as a material finding (CL 04)
  • No monitoring or verification report data available — total verified ERR, monitoring period, and usage rates are all absent from the extracted record
  • Minimum extraction confidence rated 'low', indicating at least one key document was poorly readable

Credit Vintages

No issuances recorded on the registry.

Risk Indicators

Additionality

VVB-confirmed regulatory test

Permanence

N/A – energy substitution project

Leakage

0% deduction, doc contradiction, VVB flagged

Baseline

Project-specific, measured, no reassessment date

Safeguards

Grievance & benefit-sharing present, FPIC not stated

Double-claim

CORSIA and CCP status not stated

Where to buy

+ Know where to buy this?

Listing multiple projects? Send us a CSV at [email protected].

⚑ Dispute this rating
Analysis ProvenanceScored2026-08-25AMS-III.D., AMS-I.D.

Are you the project owner?

Metadata correction (free)

Name, country, marketplace or links incorrect? Let us know.

Does not modify the score.

[email protected]

Pipeline re-run with new documents

Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.

Submit Documents