Gansu Wuwei Liangzhou Grouped AWMS GHG Mitigation Project
#174of 204 in China#559of 629 in Verra (VCS)#50of 62 in AMS-III.D
Audit Analysis
This grouped anaerobic waste management project in Gansu, China, has a VVB-confirmed regulatory additionality test and a standardized methodology (AMS-III.D), but suffers from significant gaps: FPIC was not conducted, the buffer pool is unconfirmed, the project-specific baseline is modeled rather than measured, and the biogas electricity units were not yet installed at validation. Three corrective actions remain open and extraction confidence is low, limiting confidence in the overall data quality.
Red Flags
- FPIC was not conducted despite the project affecting local communities in Gansu, China
- Buffer pool percentage is not stated in any available document, leaving permanence risk unquantified
- Biogas electricity generation units were not yet installed at the time of validation (expected June 2024), meaning the project had not yet begun operations
- Three corrective actions remain open, including a missing calculation equation and unaddressed different start dates for project instances
- Minimum extraction confidence is rated low, indicating at least one key document was poorly readable
Credit Vintages
No issuances recorded on the registry.
Risk Indicators
VVB-confirmed regulatory test
Buffer pool not stated; reversal risk unquantified
0% deduction; 'quantified' justification but no detail
Project-specific, modeled; reassessment not yet due (10-yr i
FPIC not conducted; grievance mechanism present
CORSIA and CCP status not stated
⚑ Dispute this rating
Are you the project owner?
Metadata correction (free)
Name, country, marketplace or links incorrect? Let us know.
Does not modify the score.
[email protected] →Pipeline re-run with new documents
Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.
Submit Documents →