Gansu Baiyin AWMS Biogas Recovery and Utilization Project
#58of 111 in Biogas#147of 204 in China#465of 629 in Verra (VCS)#30of 62 in AMS-III.D
Audit Analysis
A VCS biogas recovery project under the AMS-III.D methodology with VVB-confirmed regulatory additionality and no inherent reversal risk, but burdened by 18 material findings and 18 corrective actions at validation, a 0% leakage deduction justified only as 'deemed negligible,' and the absence of FPIC. The VVB reduced the lifetime ERR from the PDD's 761,730 to 555,875 tCO₂e, a 27% downward adjustment that is reassuring, yet the sheer volume of unresolved documentation gaps and the low extraction confidence of the source records limit confidence in the project's current compliance posture.
Red Flags
- 18 material findings and 18 corrective actions identified in the validation report, including missing applicability assessment, incomplete 'No Net Harm' analysis, and unavailable ER calculation sheet
- FPIC was not conducted despite the project's presence in a rural Chinese community, creating a safeguards gap
- Leakage deduction of 0% justified solely as 'deemed negligible' without a quantified assessment, which is thin for a biogas handling project
- Low extraction confidence across the document set, with one document of unknown type, reducing reliability of the extracted record
- Contradiction in additionality test type between the PDD (barrier) and the validation report (regulatory), and a 27% discrepancy in lifetime ERR between the two documents
Credit Vintages
No issuances recorded on the registry.
Risk Indicators
VVB-confirmed regulatory test
Avoidance project, no reversal risk
0% deduction, 'deemed negligible' only
Project-specific, modeled; reassessment not yet due
Grievance & benefit sharing present; FPIC not conducted
CORSIA and CCP status not stated
⚑ Dispute this rating
Are you the project owner?
Metadata correction (free)
Name, country, marketplace or links incorrect? Let us know.
Does not modify the score.
[email protected] →Pipeline re-run with new documents
Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.
Submit Documents →