Improved Cookstove Program in Lao PDR
GS-717 ↗ · current registry ID: GS4233
#979of 1329 in Industrial#1407of 1801 in Gold Standard (GS)
Audit Analysis
The Improved Cookstove Program in Lao PDR has VVB-confirmed additionality and no reversal events, but is burdened by an extensive list of material findings and corrective actions spanning data quality, calculation errors, and monitoring gaps. Cumulative verified emissions reductions already exceed the lifetime ex-ante estimate, raising over-crediting concerns. Multiple contradictions between documents on key parameters (usage rate, fNRB method, FPIC status) further erode confidence in the project's data integrity.
Red Flags
- Cumulative verified reductions (≈369,709 tCO2e across two monitoring periods) exceed the lifetime ex-ante estimate of 366,531 tCO2e, indicating potential over-crediting
- 40+ material findings and 30+ corrective actions reported in the 2026 verification report, including KPT not performed at defined frequency, sales database discrepancies, and use of outdated validation values
- FPIC status contradicts between the PDD (conducted) and the most recent monitoring report (not conducted); the more recent document indicates FPIC was not carried out
- Usage rate assumed at 100% in the 2018 verification report versus 0.9 in the PDD — a 10× discrepancy in a key emission factor parameter
- Missing Declaration of No Double Counting for the current monitoring period
Credit Vintages
| Issued | Retired | Available | ||
|---|---|---|---|---|
| 2014 | 4,871 | 4,871 | 0 | |
| 2015 | 18,500 | 18,500 | 0 | |
| 2016 | 34,553 | 34,256 | 297 | |
| 2017 | 32,363 | 32,363 | 0 | |
| 2018 | 44,033 | 44,033 | 0 | |
| 2019 | 51,171 | 50,929 | 242 | |
| 2020 | 63,751 | 63,751 | 0 | |
| 2021 | 95,537 | 11,388 | 84,149 | |
| 2022 | 136,844 | 29,920 | 106,924 | |
| 2023 | 79,137 | 77,555 | 1,582 | |
| Total | 560,760 | 367,566 | 193,194 |
Risk Indicators
VVB-confirmed common-practice test
no reversals
0% deduction, justified but not quantified in older doc
Project-specific baseline, reassessed 2025
Grievance mechanism present; FPIC not conducted per latest MR
CORSIA and CCP status both not stated
⚑ Dispute this rating
Are you the project owner?
Metadata correction (free)
Name, country, marketplace or links incorrect? Let us know.
Does not modify the score.
[email protected] →Pipeline re-run with new documents
Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.
Submit Documents →