Skip to main content
PURBiochar, 2022ChinaGeneral Methodologyv2.0

Jiaxing Tongao Biochar Plant

PUR-554214 ↗

#37of 44 in Biochar#186of 204 in China#86of 109 in Puro.earth (PUR)

4.0/ 10
Integrity
4.5
Transparency
3.0
Claim Safety
4.5
Documentation
3.5

Audit Analysis

The Jiaxing Tongao Biochar Facility is a newly validated Puro biochar project (May 2025) with additionality confirmed by the VVB and no material findings, but the available record is extremely thin: only a single validation report exists, and critical integrity parameters (baseline method, leakage treatment, permanence/buffer pool, crediting period) are entirely absent from the extracted data. The project cannot be meaningfully assessed for over-crediting risk or MRV robustness at this stage.

Red Flags

  • No baseline methodology or baseline reassessment date is stated in the validation report, leaving the reference scenario unverifiable
  • Leakage is entirely unaddressed — no deduction percentage and no justification appear in the available document
  • No permanence or buffer-pool data is available despite biochar permanence being a core claim of the Puro standard
  • Only one document (the validation report) is in the evidence base; no PDD, monitoring report, or verification report has been extracted

Credit Vintages

Issuance data not yet available — check back soon.

Risk Indicators

Additionality

VVB-confirmed but test type unspecified

Permanence

Biochar permanence assumed; no buffer or reversal data

Leakage

No deduction or justification found

Baseline

Method not stated in available documents

Safeguards

Mentioned but no FPIC or grievance detail

Double-claim

CORSIA and CCP status both unstated

Where to buy

+ Know where to buy this?

Listing multiple projects? Send us a CSV at [email protected].

⚑ Dispute this rating
Analysis ProvenanceScored2026-08-19General Methodology v2.0

Are you the project owner?

Metadata correction (free)

Name, country, marketplace or links incorrect? Let us know.

Does not modify the score.

[email protected]

Pipeline re-run with new documents

Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.

Submit Documents