Nuntårp Gård
#30of 44 in Biochar#5of 5 in Sweden#72of 109 in Puro.earth (PUR)
Audit Analysis
Nuntårp Gård is a Swedish biochar project verified by bio.inspecta AG under the Puro.earth standard. While additionality is confirmed and a 10% buffer pool is in place, the verification report identifies six material findings—including an incomplete LCA that omits biochar-use emissions, tentative biomass quantities, and incorrect transport calculations—along with eight required corrective actions. These data-quality and methodological gaps significantly undermine confidence in the verified emission reduction figures.
Red Flags
- LCA does not account for emissions from biochar use, overstating net carbon benefit (material finding in verification report)
- Biomass input quantities are tentative due to lack of weighing and moisture measurement (material finding)
- Transport emission calculations are incorrect—empty return journeys not accounted for (material finding)
- Proof of sustainable management (PEFC/FSC) for 75% of forest biomass feedstock not submitted
- Eight corrective actions required by the VVB, indicating systemic data and documentation gaps
Credit Vintages Exhausted
| Issued | Retired | Available | ||
|---|---|---|---|---|
| 2025 | 458 | 458 | 0 | |
| Total | 458 | 458 | 0 |
Risk Indicators
VVB-confirmed investment test
10% buffer pool; no reversals reported but no explicit perma
No deduction or justification stated in any document
Project-specific baseline; no reassessment date stated
Safeguards mentioned but FPIC and grievance mechanism not do
CORSIA and CCP status not stated in available documents
⚑ Dispute this rating
Are you the project owner?
Metadata correction (free)
Name, country, marketplace or links incorrect? Let us know.
Does not modify the score.
[email protected] →Pipeline re-run with new documents
Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.
Submit Documents →