PUR removal Canada Vintage 2022, 2023 Documentazione completa General Methodology v2.0

BC Biocarbon - McBride

PUR-862421 ↗

3.8 / 10
Integrity
4.6
Transparency
3.2
Claim Safety
4.0
Documentation
2.6

Score Breakdown

Integrity

verified The verification report reports no material findings and indicates a buffer pool contribution of 2.5%.

missing The verification report lists corrective actions affecting emissions allocation and missing feedstock data, and additionality/baseline/leakage details are not found in the extracted record.

Transparency

verified The monitoring/crediting period is clearly stated (2020-12-01 to 2022-02-28) and the VVB is named (EnergyLink Services Pty Ltd).

missing Claimed vs verified removals are not found in the extracted record, and low extraction confidence reduces confidence in MRV transparency.

Claim Safety

verified The project is under a defined biochar methodology (v2.2), which can reduce discretion if applied correctly.

missing Corrective actions on emissions allocation and missing feedstock deliveries increase over-crediting risk, and CORSIA/CCP status is not found in the extracted record.

Documentation

verified A dated verification report is present (2022-06-07) and multiple documents were used (4).

missing Minimum extraction confidence is low and the evidence document list is not specific (listed as “unknown”), limiting auditability.

Detailed Analysis

Integrity

The verification report (2022-06-07) reports no material findings, which is a positive signal, and the extracted record indicates a buffer pool contribution of 2.5%. However, additionality and baseline information are not found in the extracted record, which weakens confidence that removals are truly additional and correctly benchmarked. Integrity is further reduced because the verification report required corrective actions to amend the calculation method so emissions from harvesting, transport, and production were properly allocated, and to include three feedstock deliveries previously excluded from the LCA for the crediting period.

Transparency

The verification report (2022-06-07) identifies the VVB as EnergyLink Services Pty Ltd and the monitoring/crediting period is clearly stated as 2020-12-01 to 2022-02-28. However, the extracted record does not provide claimed versus verified total removals, making it difficult to independently assess issuance accuracy. Low extraction confidence also suggests that key MRV details (e.g., monitoring methods and quantified results) may be missing from the extracted record.

Claim Safety

Claim safety is constrained by the verification report’s corrective actions (2022-06-07), which indicate the initial accounting omitted relevant emissions allocation and excluded feedstock delivery data—both of which can inflate net removals if not corrected. The extracted record does not include leakage deductions or justification, leaving uncertainty about whether upstream/downstream effects were conservatively handled. CORSIA eligibility and CCP status are not found in the extracted record, increasing uncertainty for buyers seeking low-greenwashing-risk claims aligned with emerging integrity labels.

Documentation

Documentation quality is limited because the minimum extraction confidence is low, implying at least one key document was poorly readable and increasing the chance of missing critical parameters. While four documents were used and a verification report dated 2022-06-07 is present, the evidence document list is not specific (shown as “unknown”), reducing traceability. The presence of corrective actions also suggests the documentation and/or calculations required follow-up to reach an auditable final state.

Overall

No contradictions were identified in the extracted record, so there is no need to privilege one document value over another. The overall score is pulled down primarily by evidence gaps on additionality, baseline, leakage, and quantified results, plus the verification report’s corrective actions that directly affect net removal calculations. Note: under the stated gate rules, a documentation score below 3.0 would cap transparency post-scoring.

Audit Analysis

This Puro biochar removal project has some structural integrity support (a stated buffer pool contribution of 2.5%) and no material findings reported, but key additionality, baseline, leakage, and reversal information is not found in the extracted record. The verification report required corrective actions affecting emissions allocation and missing feedstock delivery data, which raises over-crediting risk for the monitored period. Low document readability and limited extracted evidence reduce confidence in the completeness of the assessment.

Project Description

Short description for puro test project 558

Red Flags

  • Corrective actions in the verification report indicate the LCA/emissions accounting initially omitted emissions allocation elements and excluded three feedstock deliveries, creating over-crediting risk.
  • Additionality test and baseline approach are not found in the extracted record for a removal project, limiting confidence in credit integrity.
  • Leakage treatment (deduction and justification) is not found in the extracted record.
  • Minimum extraction confidence is low, suggesting key details may be missing or misread.

Credit Vintages Exhausted

Issued Retired Available
2022
37 37 0
2023
40 40 0
Total 77 77 0

Cosa migliorerebbe questo punteggio

  • Publish or extract the quantified claimed and verified removals for the monitoring period, including the final post-corrective-action calculation and any issuance/retirement identifiers.
  • Provide explicit additionality and baseline documentation (test type, baseline scenario, and any reassessment timing) and a stated leakage assessment (deduction and justification), with clear references to the relevant Puro methodology sections.

Questi suggerimenti indicano quali prove pubbliche aggiuntive potrebbero migliorare il livello di confidenza di questa valutazione. Non garantiscono un punteggio futuro più alto.

Risk Indicators

Additionality

Additionality test not found in extracted record

Permanence

Buffer pool stated (2.5%) but reversals not evidenced

Leakage

Leakage deduction/justification not found in extracted record

Baseline

Baseline approach not found in extracted record

Safeguards

Safeguards mentioned, but FPIC/grievance not evidenced

Double-claim

CORSIA/CCP status not found in extracted record

Where to buy

Marketplaces

+ Know where to buy this?

Listing multiple projects? Send us a CSV at [email protected].

⚑ Dispute this rating
Analysis Provenance Scored 2026-04-02 General Methodology v2.0 Documentazione completa

Sei il proprietario di questo progetto?

Correzione metadati (gratuita)

Nome, paese, marketplace o link errati? Segnalacelo.

Non modifica lo score.

[email protected]

Rivalutazione con nuovi documenti

Hai documentazione aggiornata non ancora inclusa? Puoi richiedere un nuovo run della pipeline con i nuovi input.

Invia Documenti