Skip to main content
ICRAvoidance / ReductionTRACM0002

Karlıtepe Wind Power Project

ICR-393 ↗

#871of 1935 in Renewable energy#14of 75 in TR#20of 154 in Intl. Carbon Registry (ICR)#684of 1287 in ACM0002

5.3/ 10
Integrity
6.5
Transparency
4.0
Claim Safety
6.0
Documentation
3.5

Audit Analysis

The Karlıtepe Wind Power Project is a structurally sound avoidance project using a jurisdictional baseline and a combined additionality test, with no reversal events or material findings. However, significant transparency gaps persist: the VVB is unnamed, no verified ERR figure is available, and the extraction confidence is low. The claimed ERR is conservative relative to the pro-rata lifetime expectation, reducing over-crediting risk.

Red Flags

  • VVB name is not stated in any available document, making independent verification of additionality and baseline assumptions unverifiable
  • No verified ERR figure is available to cross-check the 305,543 tCO₂e claimed for the monitoring period
  • Only a PDD is listed in the evidence documents despite four documents being referenced, and extraction confidence is rated low

Credit Vintages

IssuedRetiredAvailable
2020
28,843028,843
2021
65,389065,389
2022
65,389065,389
2023
65,389065,389
2024
65,568065,568
2025
65,389065,389
2026
65,389065,389
2027
65,389065,389
2028
65,568065,568
2029
65,389065,389
2030
65,389065,389
Total683,0910683,091

Risk Indicators

Additionality

Combined test present; VVB confirmation not stated

Permanence

Avoidance project; no reversal events

Leakage

0% deduction; deemed negligible (appropriate for wind)

Baseline

Jurisdictional method; reassessment timing not stated

Safeguards

FPIC, grievance mechanism, benefit sharing documented

Double-claim

CORSIA and CCP status not stated

Where to buy

+ Know where to buy this?

Listing multiple projects? Send us a CSV at [email protected].

⚑ Dispute this rating
Analysis ProvenanceScored2026-09-08ACM0002

Are you the project owner?

Metadata correction (free)

Name, country, marketplace or links incorrect? Let us know.

Does not modify the score.

[email protected]

Pipeline re-run with new documents

Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.

Submit Documents