Ketrawe Foundation 2013-2017
DV-8cb633
Score Breakdown
Integrity
missing Additionality, baseline approach, leakage treatment, and permanence provisions are not stated in the extracted record (monitoring report 2024-11; validation report referenced but key fields not captured).
inferred No material findings or corrective actions are reported, but this does not substitute for missing quantification of core integrity parameters (monitoring report 2024-11).
Transparency
verified A VVB is identified (Control Union) and a monitoring period is stated (2013-01-01 to 2023-12-31) (monitoring report 2024-11).
missing Total emissions reductions/removals claimed vs verified are not stated, limiting auditability of outcomes (monitoring report 2024-11).
Claim Safety
verified The project is stated as not CORSIA-eligible, reducing one pathway for double-claiming concerns (monitoring report 2024-11).
missing Over-crediting risk is elevated because baseline, leakage, and permanence controls are not stated in the extracted record (monitoring report 2024-11).
Documentation
verified Multiple document types are referenced (monitoring report, validation report, and an additional document) with high extraction confidence (document set; monitoring report 2024-11).
missing Safeguards-related information is contradictory across documents, reducing confidence in completeness and consistency (monitoring report 2024-11 vs document dated 2023-08).
Detailed Analysis
Integrity
For a soil-carbon project, core integrity elements are not stated in the extracted record: the baseline method, any additionality test, leakage deduction and justification, and permanence provisions such as a buffer pool percentage (monitoring report 2024-11). Reversal monitoring and any reversal events are also not stated, which is a major gap given the non-permanent nature of soil carbon. While the monitoring report indicates no material findings and no corrective actions, the absence of quantified MRV and risk controls materially weakens confidence in credited outcomes (monitoring report 2024-11).
Transparency
Transparency is mixed: the monitoring period is clearly stated as 2013-01-01 to 2023-12-31 and the VVB is named as Control Union (monitoring report 2024-11). However, the extracted record does not include total removals claimed or verified, nor the monitoring/measurement approach used to quantify soil carbon changes, limiting independent scrutiny (monitoring report 2024-11). The registry field is not stated in the extracted record, which also reduces traceability of issuance and retirements.
Claim Safety
Claim safety is constrained by missing information that typically drives over-crediting risk in soil-carbon projects: baseline definition, leakage treatment, and permanence controls are not stated in the extracted record (monitoring report 2024-11). The project is stated as not CORSIA-eligible, which reduces the risk of CORSIA-related double-claiming, but CCP status is not stated, leaving uncertainty about alignment with higher-integrity labels (monitoring report 2024-11).
Documentation
Documentation coverage is moderate: three documents were used (including a monitoring report and a validation report) and extraction confidence is high, suggesting the documents were readable (document set; monitoring report 2024-11). Still, many key fields are not captured or not stated in the extracted record (baseline, additionality, leakage, permanence), indicating incomplete disclosure or incomplete extraction of critical sections. The safeguards information is inconsistent across documents, which reduces confidence in the reliability of the narrative record.
Overall
Overall quality is limited primarily by missing core integrity parameters (baseline, additionality, leakage, permanence/reversal controls) in the extracted record, which elevates over-crediting risk for a soil-carbon project (monitoring report 2024-11). One explicit contradiction exists on whether safeguards were mentioned: the 2024 monitoring report indicates safeguards were not mentioned, while a 2023-08 document indicates they were mentioned. I privilege the more recent, clearly-typed monitoring report (2024-11) as the higher-priority operational record, but the inconsistency still reduces confidence and lowers scores for documentation and integrity. Note: if documentation were scored below 3.0, transparency would be capped post-scoring under the gate rules; that cap is not triggered here.
Audit Analysis
The extracted record provides a recent monitoring report (2024-11) with a named VVB (Control Union) and no reported material findings, but it lacks core quantification needed to judge soil-carbon credit integrity. Key elements such as baseline approach, additionality testing, leakage treatment, and permanence/buffer provisions are not stated in the available extracted documents, increasing over-crediting risk.
Project Description
Ketrawe, meaning “fertile land”, is dedicated to creating windbreak forests, which offer numerous environmental benefits. Nestled within Bolivia's agricultural matrix lies HDS1 Evergreen Broadleaf Forest, which has remained at least 30-years undisturbed, a critical reservoir of biodiversity facing pressure from expanding sugarcane cultivation. Ketrawe Foundation is all about claiming the forest back from agriculture and cattle raising. The task is to convince farmers that trees are their b
Red Flags
- Baseline method and any reassessment timing are not stated in the extracted record, making it hard to evaluate whether credited removals are additional and conservatively estimated.
- No leakage deduction or leakage justification is provided, despite soil-carbon projects often having potential activity-shifting and market leakage pathways.
- Permanence provisions (buffer pool percentage) and any reversal monitoring/events are not stated, which is a major gap for soil carbon.
- Safeguards documentation is inconsistent across documents (one source indicates safeguards were mentioned while the 2024 monitoring report indicates they were not).
Credit Vintages
Nessuna emissione registrata sul registro.
Cosa migliorerebbe questo punteggio
- Disclose and/or extract the baseline approach, additionality test, and quantified ERR/soil-carbon accounting method (including uncertainty and verification results) from the validation/verification materials.
- Provide explicit permanence risk management: buffer pool contribution (if any), reversal monitoring protocol, and any reversal events/adjustments over the monitoring period.
- Publish leakage assessment with a quantified deduction or a clear, project-specific justification for negligible leakage.
Questi suggerimenti indicano quali prove pubbliche aggiuntive potrebbero migliorare il livello di confidenza di questa valutazione. Non garantiscono un punteggio futuro più alto.
Risk Indicators
No additionality assessment found in extracted record
Permanence controls and reversals not stated
Leakage deduction/justification not stated
Baseline method not stated
No FPIC/grievance mechanism; safeguards inconsistently documented
Not CORSIA-eligible, but CCP/registry status not stated
Where to buy
Marketplaces
+ Know where to buy this?
Listing multiple projects? Send us a CSV at [email protected].
⚑ Dispute this rating
Registry Documents
Sei il proprietario di questo progetto?
Correzione metadati (gratuita)
Nome, paese, marketplace o link errati? Segnalacelo.
Non modifica lo score.
[email protected] →Rivalutazione con nuovi documenti
Hai documentazione aggiornata non ancora inclusa? Puoi richiedere un nuovo run della pipeline con i nuovi input.
Invia Documenti →