King County Rural Forest Carbon Project
#98of 137 in Soil carbon#159of 265 in United States#1046of 1233 in Verra (VCS)#5of 6 in VM0012
Audit Analysis
The King County Rural Forest Carbon Project has VVB-confirmed additionality, a 12% buffer pool, and no reported reversals, but is undermined by 12 material findings (including ineligible areas and missing leakage assessment), 18 corrective actions, a 100-year crediting period, and contradictory safeguards documentation. The most recent verification report (2025) reverses earlier positive findings on FPIC, grievance mechanisms, and benefit sharing, raising serious concerns about stakeholder protections. Overall, the project's carbon accounting framework is present but its integrity and documentation quality are significantly compromised.
Red Flags
- 12 material findings in the verification report, including ineligible areas within project polygons and missing leakage assessment
- 18 corrective actions required by TÜV SÜD, indicating the verification was not a clean pass
- 100-year crediting period (2015–2114) with contradictory crediting periods between the project description and validation report
- Most recent verification report (2025) reports FPIC not conducted, no grievance mechanism, and no benefit sharing — reversing earlier positive findings
- Leakage justification is internally contradictory: a 20% deduction is applied yet the justification is 'deemed negligible'
Credit Vintages
| Issued | Retired | Available | ||
|---|---|---|---|---|
| 2015 | 26,317 | 26,317 | 0 | |
| 2019 | 23,117 | 23,117 | 0 | |
| 2020 | 14,258 | 14,096 | 162 | |
| 2021 | 18,971 | 0 | 18,971 | |
| 2022 | 29,029 | 0 | 29,029 | |
| Total | 111,692 | 63,530 | 48,162 |
Risk Indicators
VVB-confirmed combined test
100-yr crediting period; buffer present, no reversals
20% deduction but contradictory justification
Project-specific; reassessment timing not stated
FPIC, grievance, benefit sharing all absent (2025 VR)
CORSIA and CCP status not stated
⚑ Dispute this rating
Are you the project owner?
Metadata correction (free)
Name, country, marketplace or links incorrect? Let us know.
Does not modify the score.
[email protected] →Pipeline re-run with new documents
Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.
Submit Documents →