Mahogany Plantation in India
#20of 261 in Soil carbon#226of 975 in India#229of 1339 in Verra (VCS)#6of 97 in AR-ACM0003
Audit Analysis
A small-scale (18.56 ha) mahogany plantation project in Maharashtra, India, with a solid additionality assessment (combined test confirmed by the VVB) and a 12% buffer pool, but hampered by a project-specific baseline, a 46% gap between claimed and verified emissions reductions for the first monitoring period, and several unresolved documentation gaps (CORSIA/CCP status, usage monitoring). The young age of the plantation (trees planted December 2020) explains the low absolute carbon stocks but does not fully reconcile the over-claiming relative to the proponent's own period estimate.
Red Flags
- Verified ERR (4,280 tCO₂e) is only 53.6% of the proponent's claimed figure (7,981 tCO₂e) for the same monitoring period, indicating a 46% over-claim
- The PDD states a lifetime ERR of 230,982 tCO₂e while the validation report cites 7,981 tCO₂e — a 29× discrepancy that, while likely reflecting different scopes (lifetime vs. period), signals inconsistent reporting across documents
- One Forward Action Request remains open: the project must still assess a mechanism for covering the opportunity cost of land after the Land Tenure Agreement is reached
- CORSIA eligibility and CCP status are not stated in any available document, leaving dual-channel risk unassessed
Credit Vintages
| Issued | Retired | Available | ||
|---|---|---|---|---|
| 2019 | 41 | 6 | 35 | |
| 2020 | 1,342 | 0 | 1,342 | |
| 2021 | 1,338 | 0 | 1,338 | |
| 2022 | 1,045 | 0 | 1,045 | |
| Total | 3,766 | 6 | 3,760 |
Risk Indicators
Combined test, VVB-confirmed
12% buffer, no reversals
Quantified, 0% justified
Project-specific, not yet due for reassessment
FPIC, grievance mechanism documented
CORSIA/CCP status not stated
⚑ Dispute this rating
Are you the project owner?
Metadata correction (free)
Name, country, marketplace or links incorrect? Let us know.
Does not modify the score.
[email protected] →Pipeline re-run with new documents
Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.
Submit Documents →