Mandsaur Wind Power Project in Madhya Pradesh
Score Breakdown
Integrity
verified Additionality was tested using an investment test and was confirmed by the VVB in the verification report.
missing The project uses a project baseline rather than a clearly standardized or jurisdictionally reassessed baseline, and buffer pool coverage is not stated.
Transparency
verified The monitoring period, VVB name, methodology version, and crediting period are identified in the verification report.
missing No verified emission reduction totals are provided, and usage monitoring details are not stated in available documents.
Claim Safety
verified Leakage is treated as negligible with a 0% deduction in the verification report.
missing The project is marked CORSIA-eligible, while CCP status is not mentioned, leaving some dual-claim uncertainty.
Documentation
verified Multiple document types were used, including the PDD, verification report, monitoring report, and stakeholder consultation materials.
missing At least one source was poorly readable only at medium confidence, and the record includes several unresolved contradictions.
Detailed Analysis
Integrity
The verification report from Applus+ Certification confirms additionality through an investment test, which supports the project’s core integrity case. The same report states that no extreme event caused a reversal, and leakage is described as negligible with a 0% deduction. However, buffer pool coverage is not stated, and the baseline is project-specific rather than clearly standardized, which keeps the score below the top tier.
Transparency
The verification report provides the monitoring period, methodology, VVB name, and crediting period, so the project is not opaque. That said, the extracted record does not include total claimed or verified emission reductions, and usage monitoring method is not stated in available documents. The absence of these figures limits public traceability of the issuance claim.
Claim Safety
Claim safety is helped by the VVB-confirmed additionality test and the stated negligible leakage treatment. Still, the record does not provide claimed-versus-verified ER totals, so over-crediting cannot be independently checked from the extracted facts. CORSIA eligibility is marked true, while CCP status is not mentioned, which leaves some residual dual-claim risk.
Documentation
Documentation breadth is decent because the extracted record draws on the PDD, verification report, monitoring report, and stakeholder consultation materials. The project also shows social process evidence through FPIC, a grievance mechanism, and benefit sharing. Even so, the minimum extraction confidence is only medium, and the record contains several findings and contradictions that reduce documentation quality.
Overall
The project looks reasonably solid for a wind asset under Gold Standard, with VVB-confirmed additionality and no reported reversal event in the verification report. I privileged the verification report over the older monitoring report where contradictions existed, because it is more recent and more specific to the verified period; this means I accepted the 2016-04-01 to 2026-03-31 crediting period, the negligible leakage treatment, and the report’s statement that no extreme event caused reversal. The contradictions still matter: reversal events are otherwise not addressed in the extracted record, leakage is inconsistent across documents, and the crediting period differs from the monitoring report, so reliability is reduced even though the core project case remains acceptable.
Audit Analysis
This is a wind project with a VVB-confirmed investment test, a project baseline, and no reported reversal event in the verification report. The main weaknesses are limited visibility into claimed versus verified emission reductions, no documented usage monitoring details, and some document inconsistencies that reduce confidence in the record.
Project Description
Developer: Renew Power Synergy Private Limited Type: Wind Size: Large Scale Methodology: ACM0002 Grid-connected electricity generation from renewable sources Crediting period: 2016-04-01 → 2026-03-31 Estimated annual credits: 84956 tCO2e SDGs: Goal 13: Climate Action, Goal 8: Decent Work and Economic Growth, Goal 7: Affordable and Clean Energy
Red Flags
- No claimed-versus-verified emission reduction figures are available, so over-crediting cannot be checked from the extracted record.
- The record contains contradictions on reversal events, leakage treatment, and the crediting period, which weakens reliability.
Credit Vintages
| Issued | Retired | Available | ||
|---|---|---|---|---|
| 2019 | 7,387 | 7,387 | 0 | |
| 2020 | 53,125 | 53,125 | 0 | |
| 2021 | 55,963 | 54,844 | 1,119 | |
| 2022 | 54,674 | 12,793 | 41,881 | |
| 2023 | 52,598 | 51,548 | 1,050 | |
| 2024 | 21,060 | 16,188 | 4,872 | |
| Total | 244,807 | 195,885 | 48,922 |
Cosa migliorerebbe questo punteggio
- Publish the verified emission reduction totals alongside the claimed totals for the monitoring period.
- Clarify the leakage and reversal treatment across documents and provide explicit buffer pool or permanence handling details.
Questi suggerimenti indicano quali prove pubbliche aggiuntive potrebbero migliorare il livello di confidenza di questa valutazione. Non garantiscono un punteggio futuro più alto.
Risk Indicators
VVB-confirmed investment test
No reversal reported, but buffer not stated
0% deduction with negligible justification
Project baseline, reassessment timing unclear
FPIC, grievance mechanism, and benefit sharing
CORSIA-eligible; CCP status not mentioned
Where to buy
+ Know where to buy this?
Listing multiple projects? Send us a CSV at [email protected].
⚑ Dispute this rating
Sei il proprietario di questo progetto?
Correzione metadati (gratuita)
Nome, paese, marketplace o link errati? Segnalacelo.
Non modifica lo score.
[email protected] →Rivalutazione con nuovi documenti
Hai documentazione aggiornata non ancora inclusa? Puoi richiedere un nuovo run della pipeline con i nuovi input.
Invia Documenti →