Skip to main content
CarbonMeld CarbonMeld Carbon Observatory

Rated

Monjolinho Energética S/A Hydropower Plant Project (Alzir dos Santos Antunes)

Standard
ACR
Methodology
ACM0002 (CDM)
Registry
ACR-177 ↗ · Crediting ended
Country
Rio Grande do Sul, Brazil
Credit type
Renewable Energy

CarbonMeld's document-based rating gives Monjolinho Energética S/A Hydropower Plant Project (Alzir dos Santos Antunes) (ACR-177) 2.8 out of 10 (Very low rating) under CarbonMeld methodology v3, documents read on 31 Oct 2026. The analysis read 3 of the 3 registry documents. It is CarbonMeld's own assessment, not a rating given by the registry or the standard.

Crediting ended

The crediting period has ended. Credits already issued exist; no new ones will be issued unless the crediting period is renewed.

American Carbon Registry: “COMPLETED”

Assessment

Document-based rating

2.8/10

Very low rating (under 3.5)

Evidence coverage: medium

How solid the credit is, as far as the registry's public documents show. Additionality and quantification start from a public grade; permanence starts at 5.0, the neutral point, where none applies, and claim safety always does.

Methodology v3 · documents read on 31 Oct 2026

Starting point

  • Additionality: CCQI's score for this type of project (CCQI does not grade this programme for this type of project: the CDM grade is used)
  • Quantification: CCQI's score for this type of project (CCQI grades version 21 of this methodology) (CCQI does not grade this programme for this type of project: the CDM grade is used)
  • Claim safety: neutral (5.0) — no public grade of this type of project applies

Rules that raised the number: 1

Rules that lowered the number: 1

Each rule, with the fact and the source it rests on, is in the Premium analysis.

Not counted in the number

  • The oldest vintage still on sale, the content of the safeguards and the verifier's quality: not among the facts read

How this analysis was made

Our method
CarbonMeld methodology v3 · documents read on 31 Oct 2026 · 3/3 registry documents read

Analysis

Monjolinho Energética S/A Hydropower Plant Project (Alzir dos Santos Antunes) (Rio Grande do Sul, BR) generates grid-connected renewable electricity (run-of-river hydroelectric power plant, 74MW) under ACM0002 version 15.0.2; registry status Crediting ended (ACR), 673,609 credits issued (vintages 2009–2014). The documents name DNV GL Climate Change Services AS as validation / verification body. The documents estimate 112,527 tCO2e per year. The latest verification read (2009-09-03 – 2014-08-31) verifies 673,609 tCO2e. A verification report is in the record; no monitoring report is among the documents read.

Eligibility & market

What can you claim with this credit?

Four checks buyers ask about, from the registry and the Integrity Council (ICVCM).

  • Airlines (CORSIA)

    No CORSIA label on the registry

    Not usable for airlines' CORSIA obligations.

    Source: registry label · read on 12 Nov 2026

    Covers: this project's credit records as read on the registry

  • Integrity label (ICVCM CCP)

    No ICVCM information

    No CCP label and no ICVCM decision found for this project's methodology.

  • Removal or reduction

    Emission reduction or avoidance

    Prevents or reduces emissions — fits contribution claims, not SBTi neutralisation.

    Source: project sector

    Covers: the project type, not a label on individual credits

  • Paris Agreement (Article 6)

    No Article 6 authorization

    No corresponding adjustment: the host country can also count this reduction towards its own target.

    Source: registry label · read on 12 Nov 2026

    Covers: this project's credit records as read on the registry

Information only, from public sources. Claim rules (CORSIA, SBTi, EU rules on green claims) change: check them before making a public claim. Since 27 September 2026, EU consumer rules do not allow “climate neutral” product claims based on offsets.

Credit Vintages

IssuedRetiredAvailable
2009
24,245024,245
2010
132,7374,000128,737
2011
91,97022,24669,724
2012
102,82514,59988,226
2013
180,1890180,189
2014
141,643221141,422
Total673,60941,066632,543

Methodology versions used

The methodology version stated in each monitoring, verification and issuance document, by period, compared with the official methodology pages.

  1. 2009–2014ACM0002 v15.0since replaced by v22.0

    verification report

    official page · verified on

  • ACM0002: Active (CDM / UNFCCC) · official page · verified on

A version is shown only when the document's own text writes it next to the methodology code. Current versions, status and CCP ranges come from the official pages linked, checked on the date shown.

Documents on the registry

Where to buy

Got an offer for these credits? Check it against the registry →

+ Know where to buy this?

Listing multiple projects? Send us a CSV at listings@carbonmeld.com.

Profile & governance

Are you the project owner?

Full analysis (free for owners)

Owners get free access to the full analysis of their own project: every rule that raised or lowered the number, with the fact and the source it rests on, the negative facts' detail and the documents read. Write to us from your organisation's email address.

hello@carbonmeld.com →

Metadata correction (free)

Name, country, marketplace or links incorrect? Let us know.

Does not modify the rating.

hello@carbonmeld.com →

Contest this rating

Something wrong in the analysis, or a registry document we have not used? Send us the link to the public source: you get a reference and an answer within 30 days.

Contest this rating →

Cite this page

CarbonMeld (2026). Monjolinho Energética S/A Hydropower Plant Project (Alzir dos Santos Antunes) (ACR-177): CarbonMeld document-based rating, methodology v3, documents read on 31 Oct 2026. https://carbonmeld.com/projects/monjolinho-energ-tica-s-a-hydropower-plant-project-alzir-dos-santos-antunes/.

The citation names the rating by its methodology version and the day the documents were read.

Unlock the full analysis

The dimension values of the rating, every rule that raised or lowered the number with the fact and the source it rests on, the negative facts' detail and quotes, and 3 registry documents (3 read).

€9+ VAT per month · card subscription, renews automatically until you cancel

Every rated project, PDF reports, API access, portfolio alerts and the dimension values in side-by-side comparisons, when every rated project is on the same version of our methodology (public-data comparison, the negative facts included, is free; fair use: 30 projects per day, or 300 with Pro at €49 + VAT per month). Cancel any time from your account page. Crypto: $9 for one month, no automatic renewal.

Enter your email to pay with crypto

Price + VAT · By subscribing or paying you accept the Terms of Use — the card subscription renews every month until you cancel; digital content, no refunds. How Premium works

Similar projects

Same methodology or sector, the same registry first.