Skip to main content
VCSEnergy industries (renewable/non-renewable sources); Livestock, enteric fermentation, and manure management; Waste handling and disposalChina Registry: RegisteredACM0010

Muyuan WJZ AWMS GHG Mitigation Project in Henan Province

VCS-2876 ↗

#526of 1084 in China#609of 1339 in Verra (VCS)#25of 66 in ACM0010

5.2/ 10
Integrity
5.5
Transparency
5.0
Claim Safety
5.0
Documentation
5.5

Audit Analysis

The Muyuan WJZ anaerobic digestion project in Henan Province has VVB-confirmed additionality and a registered status, but suffers from a project-specific modeled baseline, unaddressed reversal risk, and a notable 38% over-delivery relative to the PDD ex-ante estimate. Several key parameters (FNRB, buffer pool, leakage percentage, CORSIA/CCP status) are absent from the extracted record, limiting confidence in the credit's robustness.

Red Flags

  • Reversal events are explicitly 'not addressed' in the verification report — a significant gap for a biogas project where digester downtime or feedstock changes could reverse emissions
  • Verified ERR of 444,807 tCO2e exceeds the PDD ex-ante estimate of 321,663 tCO2e by ~38%, raising over-crediting questions
  • Leakage is described as 'quantified' but no specific deduction percentage is stated in any available document
  • CORSIA eligibility and CCP status are both unstated, leaving double-claiming risk unassessed

Credit Vintages

No issuances recorded on the registry.

Risk Indicators

Additionality

VVB-confirmed combined test

Permanence

mixed evidence / unresolved risk

Leakage

Quantified but no % stated

Baseline

Project-specific, modeled, reassessment not yet due

Safeguards

FPIC and grievance mechanism documented

Double-claim

CORSIA and CCP status both unstated

Where to buy

+ Know where to buy this?

Listing multiple projects? Send us a CSV at [email protected].

⚑ Dispute this rating
Analysis ProvenanceScored2026-09-03ACM0010

Are you the project owner?

Metadata correction (free)

Name, country, marketplace or links incorrect? Let us know.

Does not modify the score.

[email protected]

Pipeline re-run with new documents

Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.

Submit Documents