Skip to main content
VCSEnergy industries (renewable/non-renewable sources)Morocco Registry: RegisteredACM0002

OUARZAZATE IV CONCENTRATED SOLAR POWER PROJECT

VCS-2036 ↗

#979of 1935 in Renewable energy#4of 12 in Morocco#610of 1339 in Verra (VCS)#773of 1287 in ACM0002

5.2/ 10
Integrity
5.5
Transparency
5.0
Claim Safety
5.5
Documentation
4.5

Audit Analysis

The Ouarzazate IV CSP project is a registered VCS renewable energy project with VVB-confirmed additionality and reasonable leakage treatment, but the 2025 verification report surfaced seven material findings and thirteen corrective actions, including a meter calibration error exceeding permissible limits and a 32% gap between claimed and verified emissions reductions. The baseline method is inconsistently reported across verification cycles, and the low extraction confidence in the document set limits assurance on the completeness of the record.

Red Flags

  • Calibration error of −0.24% in energy meters exceeded the permissible ±0.2% limit, requiring a cumulative correction factor of up to −0.48% on net electricity generation (verification report, 2025).
  • Verified ERR of 364,332 tCO₂e is only 68% of the 538,480 tCO₂e claimed by the project for the same 2020–2023 monitoring period, indicating a material over-claim in the monitoring report.
  • Baseline method is reported as 'project-specific' in the 2025 verification report but as 'jurisdictional' in the 2022 verification report — an unresolved contradiction that affects baseline credibility.
  • Thirteen corrective actions were required by the VVB, spanning ERR calculation methodology, grid emission factor consistency, meter identification, and stakeholder communication documentation.
  • Minimum extraction confidence across the 13-document evidence set is rated low, reducing assurance on the completeness of the extracted record.

Credit Vintages

IssuedRetiredAvailable
2018
40,78719,45321,334
2019
96,74360,43336,310
Total137,53079,88657,644

Risk Indicators

Additionality

VVB-confirmed combined test

Permanence

mixed evidence / unresolved risk

Leakage

0% deduction, justified as negligible for CSP

Baseline

Project-specific; method contradicts earlier report

Safeguards

FPIC, grievance mechanism, benefit sharing documented

Double-claim

CORSIA and CCP status not stated

Where to buy

+ Know where to buy this?

Listing multiple projects? Send us a CSV at [email protected].

⚑ Dispute this rating
Analysis ProvenanceScored2026-09-03ACM0002

Are you the project owner?

Metadata correction (free)

Name, country, marketplace or links incorrect? Let us know.

Does not modify the score.

[email protected]

Pipeline re-run with new documents

Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.

Submit Documents