Poechos II hydroelectric plant project
Score Breakdown
Integrity
verified The validation/verification record indicates additionality was confirmed by the VVB (validation report).
missing Baseline quantification inputs (grid emission factor and reassessment timing) are not found in the extracted record, and leakage treatment is inconsistently documented (monitoring vs validation reports).
Transparency
verified A named VVB (AENOR INTERNACIONAL, S.A.U.) and a clearly stated monitoring period (2016-01-01 to 2016-03-31) are provided (monitoring report).
missing Key MRV parameters are missing from the extracted record (grid emission factor, leakage deduction), and verified ER totals are inconsistent across monitoring reports.
Claim Safety
verified The project is stated as not CORSIA-eligible, reducing aviation-claim channel risk (extracted record).
missing Over-crediting risk is elevated by contradictory verified ER figures across monitoring reports and missing baseline/leakage quantification in the extracted record.
Documentation
verified Multiple core document types are present (monitoring report, validation report, PDD) and extraction confidence is high (evidence list).
missing The extracted record shows a safeguards documentation gap (no FPIC and no grievance mechanism reported), and one evidence document is of unknown type.
Detailed Analysis
Integrity
Additionality is reported as confirmed by the VVB, which supports integrity for an ACM0002 grid-connected renewable project (validation report). The baseline is described as project-specific, but the grid emission factor and the year/vintage used are not found in the extracted record, and the timing of any baseline reassessment is also not stated. Leakage is described as negligible in a monitoring report, yet the validation report indicates it was not addressed, which weakens confidence in consistent application of the methodology.
Transparency
The extracted record provides a clear monitoring period (2016-01-01 to 2016-03-31) and identifies the VVB as AENOR INTERNACIONAL, S.A.U. (monitoring report). However, core MRV inputs needed to reproduce results—especially the grid emission factor and any explicit leakage deduction—are not found in the extracted record. Transparency is further reduced by inconsistent verified ER totals reported across different monitoring reports.
Claim Safety
The project is indicated as not CORSIA-eligible, which lowers the risk of dual-channel claims in aviation contexts (extracted record). Nonetheless, claim safety is weakened by the contradiction in verified ER totals across monitoring reports and by missing baseline quantification (grid emission factor) in the extracted record, both of which increase perceived over-crediting risk. CCP status is not stated in the extracted record, leaving uncertainty about alignment with higher-integrity claim frameworks.
Documentation
The evidence set includes key document types (monitoring report, validation report, and PDD) with a relatively high number of documents used (9) and high extraction confidence, supporting a solid documentation score. The latest extracted monitoring report date is 2022-07-12, while the monitoring period ends in 2016, indicating a long lag that can complicate traceability of decisions over time. Safeguards-related items appear weakly documented in the extracted record (no FPIC and no grievance mechanism reported), and one evidence document is listed as unknown type.
Overall
I privilege the validation report (2008-09-12) over the PDD (2023-03-02) for the additionality test type because the validation report is the VVB’s formal assessment; this supports using a barrier test as the operative basis, but the contradiction still reduces confidence. For leakage, I privilege the more recent monitoring report (2022-07-12) stating leakage is negligible over the older validation report stating it was not addressed, but the inconsistency indicates uneven documentation and warrants a score penalty. For verified ERs, I privilege the monitoring report tied to the later crediting endpoint (2017-02-06, 71,833) over the earlier monitoring report (2013-07-01, 103,856) because it is closer to the end of the stated crediting period; however, the magnitude of the discrepancy is a major reliability red flag and drives down integrity, transparency, and claim-safety scores.
Audit Analysis
This grid-connected hydro project has VVB-confirmed additionality and no reported material findings, which supports basic credit integrity. However, key quantification elements (notably grid emission factor and leakage deduction) are missing from the extracted record, and there are material inconsistencies across monitoring reports on verified ERs that increase over-crediting risk.
Project Description
The purpose of the Poechos II hydroelectric power plant is to generate electricity, utilizing renewable energy sources to be supplied to the Peruvian National Inter-connected Electric Grid (SEIN).
Red Flags
- Verified emission reductions conflict across monitoring reports (71,833 vs 103,856), undermining confidence in credited volumes.
- Grid emission factor and its vintage are not found in the extracted record, limiting the ability to assess baseline robustness for ACM0002.
Credit Vintages
Nessuna emissione registrata sul registro.
Il marketplace dichiara i vintage: 2013 (non verificato).
Cosa migliorerebbe questo punteggio
- Publish or extract the exact grid emission factor value(s), source, and applicable year(s) used under ACM0002, and document any baseline reassessment over the crediting period.
- Reconcile the conflicting verified ER totals across monitoring reports with a clear issuance/verification table (by monitoring period) and provide an explicit leakage assessment and any deduction applied (even if 0%).
Questi suggerimenti indicano quali prove pubbliche aggiuntive potrebbero migliorare il livello di confidenza di questa valutazione. Non garantiscono un punteggio futuro più alto.
Risk Indicators
VVB-confirmed additionality
Avoidance project; no reversal risk indicated
Negligible claimed but inconsistently documented
Project-specific baseline; key parameters missing
FPIC/grievance not evidenced
Not CORSIA-eligible
Where to buy
Marketplaces
+ Know where to buy this?
Listing multiple projects? Send us a CSV at [email protected].
⚑ Dispute this rating
Sei il proprietario di questo progetto?
Correzione metadati (gratuita)
Nome, paese, marketplace o link errati? Segnalacelo.
Non modifica lo score.
[email protected] →Rivalutazione con nuovi documenti
Hai documentazione aggiornata non ancora inclusa? Puoi richiedere un nuovo run della pipeline con i nuovi input.
Invia Documenti →