Qianbei Afforestation Project
Score Breakdown
Integrity
verified Additionality was confirmed by TÜV NORD CERT GmbH, and the project uses a combined additionality test under AR-ACM0003.
missing The stakeholder consultation record reports eight assessment findings and one minor finding, and the extracted record shows contradictory leakage and additionality entries.
Transparency
verified The monitoring period is stated for 2022, and the VVB is identified as TÜV NORD CERT GmbH.
missing Total verified and claimed emission removals are not stated in the extracted record, and the extraction confidence is low.
Claim Safety
verified The project reports a quantified leakage deduction of 0% and a 10% buffer pool, which helps limit over-crediting and permanence risk.
missing The record contains contradictions on leakage treatment, and the baseline is project-specific rather than a more conservative jurisdictional baseline.
Documentation
verified A large number of documents were used, and safeguards such as FPIC, grievance mechanism, and benefit sharing are described.
missing The extraction confidence is low, and key fields such as verified removals, usage monitoring, and FNRB are not stated in available documents.
Detailed Analysis
Integrity
The project has moderate integrity support because the verification record identifies TÜV NORD CERT GmbH and confirms additionality through a combined test, while the project also maintains a 10% buffer pool. No reversal events are reported in the extracted record, which is favorable for an afforestation project. That said, the stakeholder consultation material reports eight assessment findings and one minor finding, which weakens confidence in the robustness of the project claims.
Transparency
Transparency is mixed because the monitoring period for 2022 and the VVB are identified, but the extracted record does not state the total verified or claimed removals. The monitoring approach for usage is also not found in the available documents, and the minimum extraction confidence is low, indicating at least one key source was difficult to read. These gaps reduce the ability to independently trace the crediting claim end to end.
Claim Safety
Claim safety is moderate at best. The project reports a quantified leakage deduction of 0% and a 10% buffer pool, but the record also contains a contradiction showing an earlier document said leakage was not addressed and another source indicated a 10% deduction. The baseline is project-specific, and the project is marked CORSIA-eligible, which keeps dual-market and over-crediting concerns from being fully resolved.
Documentation
Documentation quality is limited by the low extraction confidence and missing key fields such as verified removals, FNRB, and usage monitoring method. On the positive side, the record indicates 56 documents were used, and safeguards are described, including FPIC, grievance mechanism, and benefit sharing. However, the presence of multiple findings and unresolved document inconsistencies means the file is not fully complete or clean.
Overall
Overall, this project looks better than average on core project design features, but the evidence base is not fully reliable. I privileged the more recent and more specific entries for leakage, additionality, reversal status, and crediting period, but the contradictions still matter: leakage is variously described as quantified, not addressed, and 10%; additionality is described as combined versus investment; CCP status is both not mentioned and previously approved; and the crediting period differs across documents. Because the more recent record is not enough to eliminate these discrepancies, the scores are held to a cautious mid-range.
Audit Analysis
This is a removal project with some strong integrity signals, including VVB-confirmed additionality, a 10% buffer pool, and no reversal events reported. However, the record has low extraction confidence, several unresolved or conflicting items, and limited visibility on key MRV details, which weakens confidence in the claimed credits.
Project Description
The Qianbei Afforestation Project is located in Guizhou Province, China, and aims to plant native tree species on barren lands for carbon sequestration while contributing to local sustainable development goals. The project has planted 50,061 hectares of forest, enhancing biodiversity and mitigating the effects of climate change. The project also focuses on improving the livelihoods of local communities. It has created jobs for villagers, with 70% of the workforce being women, and provided training in planting and management techniques. The project has also improved soil quality and contributed to the control of rocky desertification.
Red Flags
- Registry status: WITHDRAWN — project withdrawn from the registry (terminal)
- Low extraction confidence and multiple assessment findings reduce trust in the documentation.
- Conflicting records on leakage treatment, additionality test type, CCP status, and crediting period indicate reliability issues.
Credit Vintages
| Issued | Retired | Available | ||
|---|---|---|---|---|
| 2016 | 121,811 | 117,545 | 4,266 | |
| 2017 | 132,329 | 127,742 | 4,587 | |
| 2018 | 244,033 | 181,513 | 62,520 | |
| 2019 | 339,574 | 148,810 | 190,764 | |
| 2020 | 456,391 | 164,598 | 291,793 | |
| 2021 | 555,255 | 253,504 | 301,751 | |
| Total | 1,849,393 | 993,712 | 855,681 |
Cosa migliorerebbe questo punteggio
- Publish a clean, reconciled monitoring package with verified and claimed removals, leakage treatment, and the final crediting period clearly aligned across documents.
- Provide a complete, readable VVB trail that resolves the contradictions on additionality, CCP status, and assessment findings, with explicit closure evidence for all issues.
Questi suggerimenti indicano quali prove pubbliche aggiuntive potrebbero migliorare il livello di confidenza di questa valutazione. Non garantiscono un punteggio futuro più alto.
Risk Indicators
VVB-confirmed additionality test
buffer pool present, no reversals reported
quantified but contradictory leakage treatment
project baseline with reassessment date stated
FPIC and grievance mechanism documented
CORSIA-eligible; CCP status unclear
Where to buy
Marketplaces
+ Know where to buy this?
Listing multiple projects? Send us a CSV at [email protected].
⚑ Dispute this rating
Registry Documents
issuance
monitoring
- CCB_MON_REP_ENG_DRAFT_2082_01JAN2020_31DEC2020_updated_clean.pdf
- CCB_MON_REP_ENG_DRAFT_2082_01JAN2021_31DEC2021.pdf
- CCB_MON_REP_SUM_CHI_DRAFT_2082_01JAN2020_31DEC2020.pdf
- Qianbei-MR_SUM-2nd-20211030_V04_clean.pdf
- CCB_MON_REP_ENG_DRAFT_2082_01JAN2016_31DEC2019_updated_clean.pdf
- CCB_MON_REP_ENG_DRAFT_2082_01JAN2022_31DEC2022.pdf
- +9 more
Other
pdd
Sei il proprietario di questo progetto?
Correzione metadati (gratuita)
Nome, paese, marketplace o link errati? Segnalacelo.
Non modifica lo score.
[email protected] →Rivalutazione con nuovi documenti
Hai documentazione aggiornata non ancora inclusa? Puoi richiedere un nuovo run della pipeline con i nuovi input.
Invia Documenti →