Reduction of Enteric Methane Emissions using Feed Additives on Dairy Farms in the Netherlands

VCS-5022 ↗

#7of 7 in Netherlands#1136of 1233 in Verra (VCS)#5of 6 in VM0041

3.9/ 10
Integrity
4.5
Transparency
4.0
Claim Safety
3.0
Documentation
4.0

Audit Analysis

This VCS dairy feed-additive project in the Netherlands has confirmed additionality and a functioning grievance mechanism, but is undermined by eight material findings—including inconsistencies in key emission parameters (GEI, fat content, GWP values) and a discrepancy between the PDD and verification report on transport parameters. The verified ERR of 32,674 tCO₂e for the first monitoring period represents only about 3% of the pro-rata expectation derived from the PDD's lifetime estimate of 7,198,488 tCO₂e, raising serious over-crediting concerns. Permanence risk inherent to feed-additive projects is not explicitly addressed, and no buffer pool is documented.

Red Flags

  • Verified ERR of 32,674 tCO₂e is only ~3.2% of the pro-rata expectation (~1,007,788 tCO₂e) derived from the PDD lifetime estimate of 7,198,488 tCO₂e over the 10-year crediting period, indicating a potential 200× over-crediting in the ex-ante estimate
  • Eight material findings in the verification report, including inconsistencies in GEI, fat content, and GWP values between ex-ante and ex-post parameters, and a discrepancy in transport parameters (Di, TEFi) between the PDMR and JVVR
  • Permanence/reversal risk is not explicitly addressed in the available documents and no buffer pool percentage is stated, despite the inherent reversal risk of a feed-additive project where discontinuation restores baseline emissions
  • Low extraction confidence across the document set, meaning key parameters (FNRB, usage rates, carbon content) could not be reliably extracted from the available records

Credit Vintages

No issuances recorded on the registry.

Risk Indicators

Additionality

VVB-confirmed combined test

Permanence

Reversal risk inherent, not explicitly addressed, no buffer

Leakage

0% deduction, contradictory justifications across documents

Baseline

Project-specific modeled baseline, parameter inconsistencies

Safeguards

FPIC and grievance present, but stakeholder consultation gap

Double-claim

CORSIA and CCP status not stated in available records

Where to buy

+ Know where to buy this?

Listing multiple projects? Send us a CSV at [email protected].

⚑ Dispute this rating
Analysis ProvenanceScored2026-08-28VM0041

Are you the project owner?

Metadata correction (free)

Name, country, marketplace or links incorrect? Let us know.

Does not modify the score.

[email protected]

Pipeline re-run with new documents

Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.

Submit Documents