Renewable Power Project by Devarahipparigi Wind Power Private Limited
#629of 1935 in Renewable energy#307of 975 in India#363of 1339 in Verra (VCS)#485of 1287 in ACM0002
Audit Analysis
A VCS-registered wind power project in India with VVB-confirmed additionality and consistent verified emission reductions, but undermined by a baseline method contradiction between documents, ten verification findings (six corrective action requests), and a formula inconsistency flagged by the VVB. The project's renewable-energy nature limits permanence and leakage risk, yet documentation gaps and medium extraction confidence temper confidence in the overall record.
Red Flags
- Baseline method is recorded as 'project' in the 2024 verification report but 'jurisdictional' in the 2023 monitoring report — an unresolved contradiction that affects the validity of the counterfactual.
- Ten verification findings were raised, including six Corrective Action Requests, a formula inconsistency in net electricity calculation, and a 9.9% over-delivery relative to the registered project description estimate without adequate explanation.
- Grid emission factor of 0.9475 tCO2/MWh is drawn from 2018 data; no updated or jurisdictional grid factor is cited for the 2021–2022 monitoring period.
Credit Vintages
| Issued | Retired | Available | ||
|---|---|---|---|---|
| 2017 | 191,352 | 191,352 | 0 | |
| 2018 | 269,033 | 189,252 | 79,781 | |
| 2019 | 297,525 | 202,279 | 95,246 | |
| 2020 | 452,144 | 22,752 | 429,392 | |
| 2021 | 241,925 | 23,000 | 218,925 | |
| 2022 | 234,076 | 0 | 234,076 | |
| Total | 1,686,055 | 628,635 | 1,057,420 |
Risk Indicators
VVB-confirmed combined test
Wind project – minimal reversal risk
0% deduction, negligible for grid-connected wind
Project-specific; method contradicted across docs
FPIC & grievance present but initially undocumented
Not CORSIA-eligible; CCP not mentioned
⚑ Dispute this rating
Are you the project owner?
Metadata correction (free)
Name, country, marketplace or links incorrect? Let us know.
Does not modify the score.
[email protected] →Pipeline re-run with new documents
Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.
Submit Documents →