VCS Energy industries (renewable/non-renewable sources) India Registry: Registered Documentazione completa General Methodology v2.0

Renewable Power Project by Saipuram Wind Energies Private Limited

VCS-1788 ↗

4.5 / 10
Integrity
5.2
Transparency
4.1
Claim Safety
4.6
Documentation
3.4

Score Breakdown

Integrity

verified The verification report confirms additionality was checked by the VVB, and the project is a renewable power activity under ACM0002.

missing Leakage is not addressed in the latest verification report, and the record shows no quantified leakage deduction.

Transparency

verified The monitoring period is clearly stated for 2021-01-01 to 2022-12-31, and the VVB is named as VKU Certification Pvt. Ltd.

missing Claimed versus verified emission reduction totals are not stated, and the usage monitoring method is not found in the extracted record.

Claim Safety

verified The project uses a standard renewable-energy methodology and has no reported reversal events, which reduces some over-crediting concerns.

missing The latest record does not address leakage, and no CORSIA or CCP status is stated, leaving dual-claim and over-crediting risk only partially bounded.

Documentation

verified The verification report is dated 2023-10-09 and covers a recent monitoring period, which helps recency.

missing Extraction confidence is low, only one evidence document is identified in the extracted record, and several key fields are missing or not stated.

Detailed Analysis

Integrity

The verification report confirms additionality was verified by VKU Certification Pvt. Ltd., which is a positive sign for project integrity. The project is a wind power activity under ACM0002, and reversal events are marked as not applicable, so permanence risk is low. However, leakage is not addressed in the latest verification record, and there is no quantified leakage deduction, which weakens the integrity assessment.

Transparency

The monitoring period is clearly stated as 2021-01-01 to 2022-12-31, and the VVB is identified, which supports basic traceability. But the extracted record does not state the verified or claimed emission reductions, and the usage monitoring method is not found. With low extraction confidence and only one evidence document identified, the transparency score is constrained.

Claim Safety

The project’s renewable-energy methodology and absence of reversal events reduce some claim-risk concerns. Still, the latest verification report says leakage is not addressed, while an earlier document reportedly treated it as negligible; I privileged the later verification report because it is more recent and more specific to the verified monitoring period. CORSIA eligibility and CCP status are not stated, so dual-claim risk cannot be ruled out from the extracted record.

Documentation

The documentation is dated and includes a recent verification report, which is helpful. However, the extraction confidence is low, only one evidence document is identified in the extracted record, and several important fields are missing, including emission totals and monitoring details. The report also notes three CLs and three CARs that were closed, which suggests some issues were identified during verification even if they were resolved.

Overall

The project looks better than average on basic integrity because additionality was VVB-verified and the activity is a standard renewable power project with no reversal risk. I privileged the 2023-10-09 verification report over the earlier 2021-04-21 document in the contradiction on leakage and FPIC because it is later and tied to the verified monitoring period; that means leakage is treated as not addressed, while FPIC is treated as conducted. The overall score is held back by missing quantitative MRV data, low extraction confidence, and unresolved transparency gaps.

Audit Analysis

This is a registered wind power project with VVB-verified additionality and no reversal events applicable, which supports a moderate integrity profile. However, leakage is not addressed in the latest verification record, key quantitative MRV fields are missing, and the extraction confidence is low, which weakens both transparency and documentation quality.

Project Description

Proponent: Saipuram Wind Energies Private Limited Protocol categories: Energy industries (renewable/non-renewable sources) Protocols: ACM0002 Estimated annual GHG reductions: 266287 tCO2e Region: Asia Registration date: 2018-08-14

Red Flags

  • Leakage is described as not addressed in the latest verification report, despite an earlier document saying it was deemed negligible.
  • The record has low extraction confidence and only one evidence document is identified, limiting confidence in completeness.

Credit Vintages

Issued Retired Available
2017
115,302 115,302 0
2018
207,067 207,067 0
2019
188,071 181,044 7,027
2020
145,158 81,000 64,158
2021
180,553 0 180,553
2022
177,534 0 177,534
Total 1,013,685 584,413 429,272

Cosa migliorerebbe questo punteggio

  • Provide the verified and claimed emission reduction totals, along with the full monitoring methodology and calculation sheets.
  • Clarify leakage treatment and publish the basis for the FPIC and safeguard documentation in the latest verification package.

Questi suggerimenti indicano quali prove pubbliche aggiuntive potrebbero migliorare il livello di confidenza di questa valutazione. Non garantiscono un punteggio futuro più alto.

Risk Indicators

Additionality

VVB-confirmed additionality

Permanence

No reversal risk applicable

Leakage

Leakage not addressed

Baseline

Project baseline stated, reassessment timing missing

Safeguards

FPIC and grievance mechanism documented

Double-claim

CORSIA/CCP status not stated

Where to buy

+ Know where to buy this?

Listing multiple projects? Send us a CSV at [email protected].

⚑ Dispute this rating
Analysis Provenance Scored 2026-04-19 General Methodology v2.0 Documentazione completa

Sei il proprietario di questo progetto?

Correzione metadati (gratuita)

Nome, paese, marketplace o link errati? Segnalacelo.

Non modifica lo score.

[email protected]

Rivalutazione con nuovi documenti

Hai documentazione aggiornata non ancora inclusa? Puoi richiedere un nuovo run della pipeline con i nuovi input.

Invia Documenti