Renewable Solar Power Project By Rishabh Renergy
#394of 1935 in Renewable energy#199of 975 in India#197of 1339 in Verra (VCS)#139of 806 in AMS-I.D
Audit Analysis
A straightforward grid-connected solar project in India verified by a reputable VVB (Applus+), with a jurisdictional baseline and no over-crediting (claimed and verified ERR match exactly at 24,224 tCO2). However, multiple material findings in the verification report—including inconsistencies in baseline emission values and missing supporting documents—along with three cross-document contradictions temper confidence in the underlying data quality. The project is low-risk in terms of permanence and leakage given its renewable energy nature, but documentation gaps and unquantified additionality test details leave room for improvement.
Red Flags
- Verification report identified inconsistencies in baseline emission and net electricity generation values in the monitoring report, requiring correction before issuance
- Three cross-document contradictions (baseline method, leakage justification, crediting period start date) indicate internal data management weaknesses
- Additionality test type is not stated in any available document, despite VVB confirmation of additionality
- Ten corrective actions were required, including missing No Double Counting declaration and grievance register records initially
Credit Vintages
| Issued | Retired | Available | ||
|---|---|---|---|---|
| 2018 | 10,746 | 1,000 | 9,746 | |
| 2019 | 15,451 | 4,502 | 10,949 | |
| 2020 | 14,512 | 14,512 | 0 | |
| 2021 | 7,168 | 6,991 | 177 | |
| Total | 47,877 | 27,005 | 20,872 |
Risk Indicators
VVB-confirmed but test type not stated
mixed evidence / unresolved risk
0% deduction with quantified justification
Jurisdictional but contradicted by validation report
FPIC conducted, grievance mechanism present
CORSIA and CCP status not stated
⚑ Dispute this rating
Are you the project owner?
Metadata correction (free)
Name, country, marketplace or links incorrect? Let us know.
Does not modify the score.
[email protected] →Pipeline re-run with new documents
Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.
Submit Documents →